AGL 39.50 Decreased By ▼ -0.50 (-1.25%)
AIRLINK 128.00 Decreased By ▼ -1.06 (-0.82%)
BOP 6.84 Increased By ▲ 0.09 (1.33%)
CNERGY 4.69 Increased By ▲ 0.20 (4.45%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 40.99 Increased By ▲ 0.17 (0.42%)
DGKC 82.24 Increased By ▲ 1.28 (1.58%)
FCCL 33.20 Increased By ▲ 0.43 (1.31%)
FFBL 74.39 Decreased By ▼ -0.04 (-0.05%)
FFL 11.91 Increased By ▲ 0.17 (1.45%)
HUBC 109.49 Decreased By ▼ -0.09 (-0.08%)
HUMNL 14.11 Increased By ▲ 0.36 (2.62%)
KEL 5.23 Decreased By ▼ -0.08 (-1.51%)
KOSM 7.50 Decreased By ▼ -0.22 (-2.85%)
MLCF 39.32 Increased By ▲ 0.72 (1.87%)
NBP 64.00 Increased By ▲ 0.49 (0.77%)
OGDC 193.24 Decreased By ▼ -1.45 (-0.74%)
PAEL 25.53 Decreased By ▼ -0.18 (-0.7%)
PIBTL 7.30 Decreased By ▼ -0.09 (-1.22%)
PPL 153.50 Decreased By ▼ -1.95 (-1.25%)
PRL 25.54 Decreased By ▼ -0.25 (-0.97%)
PTC 17.60 Increased By ▲ 0.10 (0.57%)
SEARL 81.60 Increased By ▲ 2.95 (3.75%)
TELE 7.65 Decreased By ▼ -0.21 (-2.67%)
TOMCL 33.48 Decreased By ▼ -0.25 (-0.74%)
TPLP 8.44 Increased By ▲ 0.04 (0.48%)
TREET 16.40 Increased By ▲ 0.13 (0.8%)
TRG 56.80 Decreased By ▼ -1.42 (-2.44%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.36 Decreased By ▼ -0.03 (-2.16%)
BR100 10,509 Increased By 63.7 (0.61%)
BR30 31,123 Decreased By -66.8 (-0.21%)
KSE100 98,265 Increased By 466.8 (0.48%)
KSE30 30,685 Increased By 203.8 (0.67%)

Pakistan Water and Power Development Authority (Wapda) has accelerated construction work on Kachhi Canal project to an optimum level, so that the project could be completed as early as possible. This was stated by Wapda Chairman Raghib Shah during his visit to Kachhi Canal project to witness the work at various sites of the project.
Expressing satisfaction over pace of the work, the Chairman said that Kachhi Canal project is of immense importance for agro-based socio-economic development in the country. He further said that the project would usher in an era of prosperity, particularly in Balochistan, through irrigated agriculture. He said that the Federal Government has released funds of Rs 2.4 billion for the project. On the directive of the Prime Minister, Wapda has planned to provide water through Kachhi Canal to Dera Bugti district of Balochistan at the earliest, he added. Raghib Shah directed the project authorities to put in their concerted efforts to achieve this goal.
It may be mentioned that the main Kachhi Canal, which off takes from Taunsa Barrage in district Muzaffargarh of Punjab province, is 500 kilometres long with a capacity of 6,000 cusecs, while length of the branch canals, distributaries and minors is about 1500 kilometers. Total command area of Kachhi Canal is 713,000 acres, however, the first phase, currently under-construction, will irrigate about 102,000 acres of barren land in remote areas of Dera Bugti, Naseerabad, and Bolan and Jhal Magsi districts in Balochistan, boosting agricultural produce in the area. Benefits of the project have been estimated Rs 5 billion per annum.
Wapda Chairman, during his visit, also observed the damages done to the Kachhi Canal project by the recent floods of hill torrents. He said that Wapda, on the directive of the prime minister, has started preparing a master plan for Southern Punjab, Balochistan and Sindh to control floods of hill torrents. The master plan aims at minimising risks to the local populace as well as the project, and utilising the water for betterment of the people residing in the areas, he added.
Wapda General Manager (Central) Water, the Chief Engineer/Project Director and others also accompanied the Chairman during his visit to the project.

Copyright Business Recorder, 2012

Comments

Comments are closed.