AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

FRANKFURT/LON DON: Oil majors BP and TotalEnergies emerged as the winners in a 7 gigawatt (GW) offshore wind site auction in Germany worth 12.6 billion euros ($13.96 billion), highlighting the appeal of renewable assets across Europe.

The move comes as European oil giants seek to grow their low-carbon businesses by entering the renewables sector, a market traditionally dominated by utilities, even though returns for solar and wind projects have come under pressure in recent years due to supply chain constraints and rising interest rates.

“The results confirm the attractiveness of investments in offshore wind power in Germany,” said Klaus Mueller, president of Germany’s energy regulator Bundesnetzagentur. He called the move an important step towards reaching a national offshore capacity goal of 30 GW by 2030.

Analysts at Jefferies noted the high price for the auction, adding that it implied “high interest in European offshore wind sites from energy companies/developers”.

Three sites in the tender for building 2 GW of offshore turbine capacity are located around 120 km (75 miles) northwest of the island of Heligoland in the North Sea and one with 1 GW lies in the Baltic Sea, some 25 km away from the island of Ruegen.

BP won the rights to develop two projects, marking its entry into offshore wind in continental Europe and representing 4 GW out of the total, it said in a separate statement.

“This is a significant milestone for BP, showing our commitment to transitioning into an integrated energy company,” BP head of offshore wind Matthias Bausenwein said.

The power from the windfarms will be used to produce low-carbon, or green, hydrogen and biofuels as well as to supply BP’s electric vehicle charging network, he said.

Awards for the other two sites, which include rights to develop, build and operate the plants and to receive network connections, went to TotalEnergies, the French company said in a statement.

“Our entry into offshore wind power in Germany, Europe’s largest electricity market, is a key step in the implementation of our strategy to become an integrated profitable player in the electricity markets,” TotalEnergies CEO Patrick Pouyanne said.

Ninety percent of the revenue from the tender will go to reducing electricity costs and marine protection measures, the regulator said.

BP said the move was fully aligned with its integrated energy strategy and disciplined capital allocation, adding it expected returns from the project of between 6% and 8%.

BP’s initial payments totalling 678 million euros, equivalent to 10% of the bid amount, will be paid by July 2024. The remaining 90% will be paid over a 20-year period when the projects become operational.

TotalEnergies said it will pay the German Federal government 582 million euros, adding an annual contribution would also be paid to the electricity transmission system operators in charge of connecting the projects for 20 years from the sites’ commissioning.

Comments

Comments are closed.