AIRLINK 170.57 Decreased By ▼ -2.58 (-1.49%)
BOP 11.18 Increased By ▲ 0.53 (4.98%)
CNERGY 8.41 Decreased By ▼ -0.11 (-1.29%)
CPHL 99.73 Increased By ▲ 2.27 (2.33%)
FCCL 46.60 Decreased By ▼ -0.65 (-1.38%)
FFL 15.15 Decreased By ▼ -0.27 (-1.75%)
FLYNG 27.55 Decreased By ▼ -0.58 (-2.06%)
HUBC 137.78 Decreased By ▼ -1.13 (-0.81%)
HUMNL 12.92 Increased By ▲ 0.11 (0.86%)
KEL 4.54 No Change ▼ 0.00 (0%)
KOSM 5.36 Decreased By ▼ -0.19 (-3.42%)
MLCF 62.40 Increased By ▲ 0.14 (0.22%)
OGDC 212.16 Decreased By ▼ -2.59 (-1.21%)
PACE 5.42 Decreased By ▼ -0.13 (-2.34%)
PAEL 47.18 Increased By ▲ 2.32 (5.17%)
PIAHCLA 18.48 Decreased By ▼ -0.22 (-1.18%)
PIBTL 10.36 Decreased By ▼ -0.38 (-3.54%)
POWER 12.33 Increased By ▲ 0.07 (0.57%)
PPL 169.60 Decreased By ▼ -4.27 (-2.46%)
PRL 35.85 Decreased By ▼ -0.37 (-1.02%)
PTC 23.09 Decreased By ▼ -0.47 (-1.99%)
SEARL 96.26 Increased By ▲ 0.95 (1%)
SSGC 39.52 Increased By ▲ 0.39 (1%)
SYM 13.84 Decreased By ▼ -0.18 (-1.28%)
TELE 7.15 Decreased By ▼ -0.08 (-1.11%)
TPLP 10.03 Decreased By ▼ -0.26 (-2.53%)
TRG 63.48 Decreased By ▼ -1.20 (-1.86%)
WAVESAPP 9.99 Decreased By ▼ -0.05 (-0.5%)
WTL 1.31 Decreased By ▼ -0.02 (-1.5%)
YOUW 3.66 Decreased By ▼ -0.04 (-1.08%)
BR100 12,305 Decreased By -186.6 (-1.49%)
BR30 37,415 Decreased By -278.7 (-0.74%)
KSE100 114,853 Decreased By -1335.9 (-1.15%)
KSE30 35,217 Decreased By -533.1 (-1.49%)

ISLAMABAD: The power supply situation has improved across the country due to lower temperature as Power Distribution Companies (Discos) are implementing only two hours’ loadshedding schedule as per policy.

Official sources told Business Recorder that the period of loadshedding in cities and areas of good revenue recovery is determined on the basis of effective demand. The difference between effective demand and gross demand is obtained by deducting the demand of low recovery and high loss areas of the country. So, the highest difference between effective demand and generation this summer occurred on June 26, which was 351 MW.

“Effective demand and production were equal on July 10, resulting in loadshedding of two hours or less in 95 percent of high recovery areas, however, loadshedding continues in areas of low recovery and high losses, which are mostly located in the west and south of the country, in addition to power outages caused by technical glitches and disruptions in the transmission system,” the sources added.

Copyright Business Recorder, 2023

Comments

Comments are closed.