AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
BR100 12,644 Increased By 35.1 (0.28%)
BR30 39,387 Increased By 124.3 (0.32%)
KSE100 117,807 Increased By 34.4 (0.03%)
KSE30 36,347 Increased By 50.4 (0.14%)

ISLAMABAD: The power supply situation has improved across the country due to lower temperature as Power Distribution Companies (Discos) are implementing only two hours’ loadshedding schedule as per policy.

Official sources told Business Recorder that the period of loadshedding in cities and areas of good revenue recovery is determined on the basis of effective demand. The difference between effective demand and gross demand is obtained by deducting the demand of low recovery and high loss areas of the country. So, the highest difference between effective demand and generation this summer occurred on June 26, which was 351 MW.

“Effective demand and production were equal on July 10, resulting in loadshedding of two hours or less in 95 percent of high recovery areas, however, loadshedding continues in areas of low recovery and high losses, which are mostly located in the west and south of the country, in addition to power outages caused by technical glitches and disruptions in the transmission system,” the sources added.

Copyright Business Recorder, 2023

Comments

Comments are closed.