AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

KENNEDY SPACE CENTER: NASA’s Artemis 3 mission, set to return humans to the Moon in 2025, might not involve a crewed landing after all, an official said Tuesday.

Jim Free, the space agency’s associate administrator for the Exploration Systems Development Mission Directorate, told reporters in a briefing that certain key elements would have to be in place – notably the landing system that is being developed by SpaceX.

Should that not be ready on time, “We may end up flying a different mission,” he said.

Under the Artemis program, NASA is planning a series of missions of escalating complexity to return to the Moon and build a sustained presence in order to develop and test technologies for an eventual journey to Mars.

The first, Artemis 1, flew an uncrewed spacecraft around the Moon in 2022. Artemis 2, planned for November 2024, will do the same with crew on board.

But it is during the Artemis 3 mission planned for December 2025 that NASA has planned its grand return to the Moon with humans for the first time since 1972, this time on the lunar south pole, where the ice can be harvested and turned into rocket fuel.

Elon Musk’s SpaceX has won the contract for a landing system based on a version of its prototype Starship rocket, which remains far from ready. An orbital test flight of Starship ended in a dramatic explosion in April.

Free said NASA officials had visited SpaceX’s Starbase facility in Texas a few weeks ago to “learn where they are with the hardware, trying to understand their schedule some more.”

Though he found the visit insightful, he said he remained concerned “because they haven’t launched,” and will need to do so multiple times before the rocket will be ready.

What’s more, delays to Starship have knock-on effects because the spacesuit contractor needs to know how the suits will interface with the spacecraft, and simulators need to be built for astronauts to learn its systems.

He added that NASA will update the public in the near future once it has had time to “digest” the information gathered during the Starbase visit.

Comments

Comments are closed.