AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,407 Increased By 220 (2.16%)
BR30 31,713 Increased By 377.1 (1.2%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

KENNEDY SPACE CENTER: NASA’s Artemis 3 mission, set to return humans to the Moon in 2025, might not involve a crewed landing after all, an official said Tuesday.

Jim Free, the space agency’s associate administrator for the Exploration Systems Development Mission Directorate, told reporters in a briefing that certain key elements would have to be in place – notably the landing system that is being developed by SpaceX.

Should that not be ready on time, “We may end up flying a different mission,” he said.

Under the Artemis program, NASA is planning a series of missions of escalating complexity to return to the Moon and build a sustained presence in order to develop and test technologies for an eventual journey to Mars.

The first, Artemis 1, flew an uncrewed spacecraft around the Moon in 2022. Artemis 2, planned for November 2024, will do the same with crew on board.

But it is during the Artemis 3 mission planned for December 2025 that NASA has planned its grand return to the Moon with humans for the first time since 1972, this time on the lunar south pole, where the ice can be harvested and turned into rocket fuel.

Elon Musk’s SpaceX has won the contract for a landing system based on a version of its prototype Starship rocket, which remains far from ready. An orbital test flight of Starship ended in a dramatic explosion in April.

Free said NASA officials had visited SpaceX’s Starbase facility in Texas a few weeks ago to “learn where they are with the hardware, trying to understand their schedule some more.”

Though he found the visit insightful, he said he remained concerned “because they haven’t launched,” and will need to do so multiple times before the rocket will be ready.

What’s more, delays to Starship have knock-on effects because the spacesuit contractor needs to know how the suits will interface with the spacecraft, and simulators need to be built for astronauts to learn its systems.

He added that NASA will update the public in the near future once it has had time to “digest” the information gathered during the Starbase visit.

Comments

Comments are closed.