AGL 40.01 Decreased By ▼ -0.20 (-0.5%)
AIRLINK 127.00 Decreased By ▼ -0.64 (-0.5%)
BOP 6.69 Increased By ▲ 0.02 (0.3%)
CNERGY 4.51 Increased By ▲ 0.06 (1.35%)
DCL 8.64 Decreased By ▼ -0.09 (-1.03%)
DFML 41.04 Decreased By ▼ -0.12 (-0.29%)
DGKC 85.61 Decreased By ▼ -0.50 (-0.58%)
FCCL 33.11 Increased By ▲ 0.55 (1.69%)
FFBL 66.10 Increased By ▲ 1.72 (2.67%)
FFL 11.55 Decreased By ▼ -0.06 (-0.52%)
HUBC 111.11 Decreased By ▼ -1.35 (-1.2%)
HUMNL 14.82 Increased By ▲ 0.01 (0.07%)
KEL 5.17 Increased By ▲ 0.13 (2.58%)
KOSM 7.66 Increased By ▲ 0.30 (4.08%)
MLCF 40.21 Decreased By ▼ -0.12 (-0.3%)
NBP 60.51 Decreased By ▼ -0.57 (-0.93%)
OGDC 194.10 Decreased By ▼ -0.08 (-0.04%)
PAEL 26.72 Decreased By ▼ -0.19 (-0.71%)
PIBTL 7.37 Increased By ▲ 0.09 (1.24%)
PPL 153.79 Increased By ▲ 1.11 (0.73%)
PRL 26.21 Decreased By ▼ -0.01 (-0.04%)
PTC 17.18 Increased By ▲ 1.04 (6.44%)
SEARL 85.60 Decreased By ▼ -0.10 (-0.12%)
TELE 7.57 Decreased By ▼ -0.10 (-1.3%)
TOMCL 34.39 Decreased By ▼ -2.08 (-5.7%)
TPLP 8.82 Increased By ▲ 0.03 (0.34%)
TREET 16.82 Decreased By ▼ -0.02 (-0.12%)
TRG 62.55 Decreased By ▼ -0.19 (-0.3%)
UNITY 27.29 Decreased By ▼ -0.91 (-3.23%)
WTL 1.30 Decreased By ▼ -0.04 (-2.99%)
BR100 10,112 Increased By 26 (0.26%)
BR30 31,188 Increased By 17.5 (0.06%)
KSE100 94,996 Increased By 232 (0.24%)
KSE30 29,481 Increased By 71 (0.24%)

LAHORE: After the resumption of power generation from the 969 MW-Neelum Jhelum Hydropower Project a couple of days ago, electricity generation by WAPDA hydel power stations crossed the 8000 MW mark, as WAPDA contributes 8158 MW to the National Grid during peak hours last night, said the spokesman.

He said effective operation and maintenance of WAPDA hydel power stations and better hydrological conditions are the other contributing factors behind this increase in WAPDA hydel generation.

Statistics show that Tarbela Hydel Power Station generated 3478 MW, Tarbela 4th Extension 1410 MW, Ghazi Barotha 1450 MW, Neleum Jhelum 798 MW, Mangla 305 MW, while all other hydel power stations of WAPDA contributed 717 MW cumulatively.

Hydel electricity by WAPDA is the cheapest if compared with other generation sources in Pakistan as the cost of WAPDA hydel generation stands at Rs.3.51 per unit. Therefore, it has a significant impact on lowering the overall tariff.

At present, WAPDA owns and operates 22 hydel power stations with a cumulative installed capacity of 9459 MW. WAPDA is vigorously implementing a least-cost energy generation plan to enhance the share of hydel electricity in the National Grid. A number of mega projects are being constructed in the hydropower sector scheduled to be completed from 2024 to 2028-29 in a phased manner. These projects will double the installed generation capacity of the country with the addition of about 10,000 MW of clean, green and low-cost hydel electricity to the National Grid.

Copyright Business Recorder, 2023

Comments

Comments are closed.