AIRLINK 211.70 Increased By ▲ 2.15 (1.03%)
BOP 10.53 Increased By ▲ 0.07 (0.67%)
CNERGY 7.35 No Change ▼ 0.00 (0%)
FCCL 34.56 Increased By ▲ 0.17 (0.49%)
FFL 18.14 Increased By ▲ 0.09 (0.5%)
FLYNG 23.25 Increased By ▲ 0.33 (1.44%)
HUBC 132.00 Decreased By ▼ -0.49 (-0.37%)
HUMNL 14.28 Increased By ▲ 0.14 (0.99%)
KEL 5.08 Increased By ▲ 0.05 (0.99%)
KOSM 7.21 Increased By ▲ 0.14 (1.98%)
MLCF 45.35 Increased By ▲ 0.15 (0.33%)
OGDC 221.00 Increased By ▲ 2.62 (1.2%)
PACE 7.76 Increased By ▲ 0.18 (2.37%)
PAEL 42.53 Increased By ▲ 0.83 (1.99%)
PIAHCLA 17.52 Increased By ▲ 0.22 (1.27%)
PIBTL 8.73 Increased By ▲ 0.18 (2.11%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 191.00 Increased By ▲ 1.97 (1.04%)
PRL 42.75 Increased By ▲ 0.42 (0.99%)
PTC 25.63 Increased By ▲ 0.46 (1.83%)
SEARL 104.50 Increased By ▲ 0.54 (0.52%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 41.15 Increased By ▲ 1.91 (4.87%)
SYM 19.44 Increased By ▲ 0.28 (1.46%)
TELE 9.41 Increased By ▲ 0.17 (1.84%)
TPLP 12.96 Decreased By ▼ -0.14 (-1.07%)
TRG 70.33 Increased By ▲ 1.15 (1.66%)
WAVESAPP 10.76 Increased By ▲ 0.04 (0.37%)
WTL 1.72 Increased By ▲ 0.01 (0.58%)
YOUW 4.18 Increased By ▲ 0.04 (0.97%)
BR100 12,224 Increased By 144.5 (1.2%)
BR30 36,957 Increased By 354.9 (0.97%)
KSE100 117,415 Increased By 1362.7 (1.17%)
KSE30 37,045 Increased By 467.2 (1.28%)

MIRPUR (AJK): Azad Jammu and Kashmir Prime Minister Chaudhry Anwar Ul Haq, while referring to the region’s incredible hydro-power potential, has said that taking full advantage of the existing hydro-power potential was imperative for socioeconomic uplift of the people of Azad Jammu Kashmir.

The PM said this while speaking at a high level meeting of the Energy and Water Resources Department held at Jammu Kashmir House in the federal metropolis on Sunday.

Stressing the need for an uninterrupted supply of electricity across the state, the PM said that along with repair and maintenance of the feeders there was an urgent need to improve the power distribution system.

The PM also sought feasibility reports regarding Khurshidabad Power Project, Transmission Line from Minhasa to Bagh and Transmission Line from Rampura to Barora.He directed the concerned authorities to prepare a feasibility report on whether the Mang area should be linked to Rawalakot or Palindri.

He said that Betaar Power Project should be upgraded for the comfort of the people of Haveli. He said that PDO must ensure better maintenance of its projects so that citizens do not face any difficulties.

Anwaar emphasized the need to adopt a better strategy regarding Jagran 1, 2, 3, 4.The Prime Minister also stressed maintenance of community development projects and local power houses in Neelum, Haveli and Jhelum Valley.

He said that the demands/needs of commercial, industrial and domestic users should be taken into account and the billing system should be made transparent so that there was no inconvenience to the public.

The Prime Minister also sought decentralization of the M&D department to reduce the workload.

He said that the three Chief Engineers have a heavy responsibility to bring out-of-the-box solutions to provide convenience to the people.

He said that the department should satisfy its seven and a half lakh customers through its best service.

Earlier, Secretary of Energy and Water Resources AJK govt. Chaudhry Muhammad Tayyab gave a detailed briefing to the Prime Minister regarding the electricity distribution system in Azad Kashmir.

The meeting was attended among others by senior minister Colonel Waqar Ahmed Noor (retd), Government Ministers Sardar Faheem Akhtar Rabbani, Mian Abdul Waheed, Chaudhry Muhammad Rashid, Chaudhry Yasir Sultan, Member Kashmir Council Raja Shuja Khurshid Rathore, Special Assistant Colonel Maroof (retd), Additional Chief Secretary Development/Principal Secretary Fayaz Ali Abbasi, Secretary Energy and Water Resources Chaudhry Muhammad Tayyab and Chief Engineer Saeed Gilani.

Comments

Comments are closed.