AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 132.66 Increased By ▲ 3.13 (2.42%)
BOP 6.89 Increased By ▲ 0.21 (3.14%)
CNERGY 4.57 Decreased By ▼ -0.06 (-1.3%)
DCL 8.92 Decreased By ▼ -0.02 (-0.22%)
DFML 42.75 Increased By ▲ 1.06 (2.54%)
DGKC 84.00 Increased By ▲ 0.23 (0.27%)
FCCL 32.90 Increased By ▲ 0.13 (0.4%)
FFBL 77.06 Increased By ▲ 1.59 (2.11%)
FFL 12.20 Increased By ▲ 0.73 (6.36%)
HUBC 110.01 Decreased By ▼ -0.54 (-0.49%)
HUMNL 14.40 Decreased By ▼ -0.16 (-1.1%)
KEL 5.53 Increased By ▲ 0.14 (2.6%)
KOSM 8.32 Decreased By ▼ -0.08 (-0.95%)
MLCF 39.67 Decreased By ▼ -0.12 (-0.3%)
NBP 65.50 Increased By ▲ 5.21 (8.64%)
OGDC 198.74 Decreased By ▼ -0.92 (-0.46%)
PAEL 26.00 Decreased By ▼ -0.65 (-2.44%)
PIBTL 7.62 Decreased By ▼ -0.04 (-0.52%)
PPL 159.00 Increased By ▲ 1.08 (0.68%)
PRL 26.24 Decreased By ▼ -0.49 (-1.83%)
PTC 18.35 Decreased By ▼ -0.11 (-0.6%)
SEARL 82.24 Decreased By ▼ -0.20 (-0.24%)
TELE 8.12 Decreased By ▼ -0.19 (-2.29%)
TOMCL 34.40 Decreased By ▼ -0.11 (-0.32%)
TPLP 8.98 Decreased By ▼ -0.08 (-0.88%)
TREET 16.88 Decreased By ▼ -0.59 (-3.38%)
TRG 59.49 Decreased By ▼ -1.83 (-2.98%)
UNITY 27.52 Increased By ▲ 0.09 (0.33%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 10,614 Increased By 206.9 (1.99%)
BR30 31,874 Increased By 160.5 (0.51%)
KSE100 98,972 Increased By 1644 (1.69%)
KSE30 30,784 Increased By 591.7 (1.96%)

LUCKNOW: Rescue teams were unable on Wednesday to reach 40 workers trapped in a collapsed highway tunnel in India, as huge boulders were blocking efforts to create an evacuation passage, officials said.

It has been three days since the tunnel collapsed but the labourers continue to be safe and healthy, one official involved in the rescue operations told Reuters.

The trapped men have been given food, water and oxygen through a pipe since Sunday morning, after the tunnel caved in at 5:30 a.m. (0000 GMT).

“A heavy machine is being brought in from New Delhi to insert an evacuation pipe as the current one is being blocked by boulders,” G.S. Naveen, relief commissioner of Uttar Pradesh state, told Reuters.

There were about 50-60 men working on the night shift in the 4.5-km (3-mile) tunnel, which is being built in neighbouring Uttarakhand state on a national highway that is part of the Char Dham Hindu pilgrimage route.

Local media reported on Tuesday that those near the exit of the tunnel got out, while the 40 who were deeper inside were trapped.

The Char Dham highway is one of the most ambitious projects of Prime Minister Narendra Modi’s Hindu nationalist government.

It aims to connect four pilgrimage sites revered by Hindus in Uttarakhand through 890 km (550 miles) of roads being built at a cost of $1.5 billion.

The mountainous region is prone to landslides, earthquakes and floods and the incident follows events of land subsidence that geologists, residents and officials have blamed on rapid construction in the mountains.

Heavy machinery brought in to pull out Indian workers from collapsed tunnel

The project has faced criticism from environmental experts and some work had been halted after hundreds of houses were damaged by subsidence along the routes.

The work on the tunnel commenced in 2018 and was intended to be completed by July 2022, which has now been delayed to May 2024, a government statement said.

Comments

Comments are closed.