AIRLINK 204.45 Increased By ▲ 3.55 (1.77%)
BOP 10.09 Decreased By ▼ -0.06 (-0.59%)
CNERGY 6.91 Increased By ▲ 0.03 (0.44%)
FCCL 34.83 Increased By ▲ 0.74 (2.17%)
FFL 17.21 Increased By ▲ 0.23 (1.35%)
FLYNG 24.52 Increased By ▲ 0.48 (2%)
HUBC 137.40 Increased By ▲ 5.70 (4.33%)
HUMNL 13.82 Increased By ▲ 0.06 (0.44%)
KEL 4.91 Increased By ▲ 0.10 (2.08%)
KOSM 6.70 No Change ▼ 0.00 (0%)
MLCF 44.31 Increased By ▲ 0.98 (2.26%)
OGDC 221.91 Increased By ▲ 3.16 (1.44%)
PACE 7.09 Increased By ▲ 0.11 (1.58%)
PAEL 42.97 Increased By ▲ 1.43 (3.44%)
PIAHCLA 17.08 Increased By ▲ 0.01 (0.06%)
PIBTL 8.59 Decreased By ▼ -0.06 (-0.69%)
POWER 9.02 Decreased By ▼ -0.09 (-0.99%)
PPL 190.60 Increased By ▲ 3.48 (1.86%)
PRL 43.04 Increased By ▲ 0.98 (2.33%)
PTC 25.04 Increased By ▲ 0.05 (0.2%)
SEARL 106.41 Increased By ▲ 6.11 (6.09%)
SILK 1.02 Increased By ▲ 0.01 (0.99%)
SSGC 42.91 Increased By ▲ 0.58 (1.37%)
SYM 18.31 Increased By ▲ 0.33 (1.84%)
TELE 9.14 Increased By ▲ 0.03 (0.33%)
TPLP 13.11 Increased By ▲ 0.18 (1.39%)
TRG 68.13 Decreased By ▼ -0.22 (-0.32%)
WAVESAPP 10.24 Decreased By ▼ -0.05 (-0.49%)
WTL 1.87 Increased By ▲ 0.01 (0.54%)
YOUW 4.09 Decreased By ▼ -0.04 (-0.97%)
BR100 12,137 Increased By 188.4 (1.58%)
BR30 37,146 Increased By 778.3 (2.14%)
KSE100 115,272 Increased By 1435.3 (1.26%)
KSE30 36,311 Increased By 549.3 (1.54%)

FAISALABAD: Faisalabad Electric Supply Company (FESCO) has electrified 108 villages in its region during the month of December with an estimated cost of Rs.199.898 million while Rs.74.856 million spent on the completion of2 High Tension (HT) and Rs.62.561 on 55 Low Tension proposals.

One special directive of Chief Executive Officer (CEO) FESCO Engr Muhammad Amir and under the supervision of Project Director (PD) Construction FESCO Ibrar Ahmed Project Directorate spent Rupees 10.371 million on completion of 10 LT proposals in Faisalabad, Rs 17.253 million on 12 LT proposals in Jhang, Rs 18.691 million on 18 LT proposals in Sargodha and spent Rs 16.247 million on the completion of 15 LT proposal in Mianwali circle.

Similarly, Rs 39.208 million were spent on electrification of 24 villages in Faisalabad, Rs. 56.473 million on electrification of 31 villages in Jhang, Rs 52.793 million on electrification of 27 villages in Sargodha and Rs 51.424 million on electrification of 27 new villages in Mianwali circle.

FESCO Project Construction Directorate completed one HT proposal in Faisalabad with the cost of Rs.40.975 million and one in Jhang with cost of Rs.33.881 million.

Chief Executive Officer (CEO) FESCO Engr. Muhammd Amir has appreciated the performance of the Project Construction Directorate and directed them to complete the more projects with the same zeal and dedication so that maximum relief could be provided to the FESCO consumers.

Copyright Business Recorder, 2024

Comments

Comments are closed.