AGL 40.00 Decreased By ▼ -0.16 (-0.4%)
AIRLINK 129.53 Decreased By ▼ -2.20 (-1.67%)
BOP 6.68 Decreased By ▼ -0.01 (-0.15%)
CNERGY 4.63 Increased By ▲ 0.16 (3.58%)
DCL 8.94 Increased By ▲ 0.12 (1.36%)
DFML 41.69 Increased By ▲ 1.08 (2.66%)
DGKC 83.77 Decreased By ▼ -0.31 (-0.37%)
FCCL 32.77 Increased By ▲ 0.43 (1.33%)
FFBL 75.47 Increased By ▲ 6.86 (10%)
FFL 11.47 Increased By ▲ 0.12 (1.06%)
HUBC 110.55 Decreased By ▼ -1.21 (-1.08%)
HUMNL 14.56 Increased By ▲ 0.25 (1.75%)
KEL 5.39 Increased By ▲ 0.17 (3.26%)
KOSM 8.40 Decreased By ▼ -0.58 (-6.46%)
MLCF 39.79 Increased By ▲ 0.36 (0.91%)
NBP 60.29 No Change ▼ 0.00 (0%)
OGDC 199.66 Increased By ▲ 4.72 (2.42%)
PAEL 26.65 Decreased By ▼ -0.04 (-0.15%)
PIBTL 7.66 Increased By ▲ 0.18 (2.41%)
PPL 157.92 Increased By ▲ 2.15 (1.38%)
PRL 26.73 Increased By ▲ 0.05 (0.19%)
PTC 18.46 Increased By ▲ 0.16 (0.87%)
SEARL 82.44 Decreased By ▼ -0.58 (-0.7%)
TELE 8.31 Increased By ▲ 0.08 (0.97%)
TOMCL 34.51 Decreased By ▼ -0.04 (-0.12%)
TPLP 9.06 Increased By ▲ 0.25 (2.84%)
TREET 17.47 Increased By ▲ 0.77 (4.61%)
TRG 61.32 Decreased By ▼ -1.13 (-1.81%)
UNITY 27.43 Decreased By ▼ -0.01 (-0.04%)
WTL 1.38 Increased By ▲ 0.10 (7.81%)
BR100 10,400 Increased By 213 (2.09%)
BR30 31,653 Increased By 316.8 (1.01%)
KSE100 97,328 Increased By 1781.9 (1.86%)
KSE30 30,192 Increased By 614.4 (2.08%)

The Business Recorder of January 08, 2024, carried a headline ‘Co asked to share logistic requirements for Reko Diq project’. After years of legal battles, fines, negotiations, and parleys the Reko Diq Copper-Gold in Baluchistan project is back on the rails.

The new consortium consists of Barrick Gold (50%), GOB (25%), and GOP (25%) while GOP is trying to sell its share to the Maadan Group of Saudi Arabia. Logistics requirements are being worked out to ship the ‘Concentrate’ produced for refining overseas.

Finished metal will then be imported to meet the copper and gold requirements of the country. A similar approach was adopted for the nearby Saindak deposit from where the unfinished metal is shipped to China where it is finished.

To meet domestic needs about 0.5 million tons per year (MTY) of refined copper is imported every year. As the Steel Mills has been shut down 5 to 6 MTY of steel is also being imported while our own iron deposits (Chiniot, Naukundi, Kalabagh) remain unutilized.

Metals are the building blocks of the nation. Having worked on all the Mineral Deposits of the country and Thar Coal, I have first-hand knowledge of the hidden un-ground wealth of Pakistan, which can be easily extracted. Unfortunately, as a nation, we are unable to put the pieces together combined with vested interests and corruption the stalemate continues.

The original investors TCC (Tathylon Copper Company) which included Barrick Gold of Canada and Antofagasta of Chile had planned to lay a pipeline to transport the concentrate to Gwadar from where it was to be shipped abroad for refining.

GOB (Government of Baluchistan) had 25% equity. Thanks to the instigation of Islamabad and the then-Chief Justice of Pakistan (CJP) litigation started when TCC was denied the Mining license. As I knew all the players, despite my best efforts for a negotiated settlement the GOP decided to fight a long legal battle, which proved to be counterproductive. Now that the project is being restarted a new Concentrate transfer network is being considered, which includes both rail and road connectivity to Port Qasim, which will entail huge investments.

In Pakistan, national needs are always ignored. Like the ‘Black Gold’ of Thar, metals are also needed. Currently, a coal-based energy system is being developed to meet the domestic needs, which also includes ’gasification ’. The public-private partnership model has been implemented in Block II. SECMC (Sindh Engro Coal Mining Company) is running the mine.

Power generation has already started, suitability for gasification has also been attained with South African collaboration. Gradually, imported coal will be replaced with our own 175 billion tons deposit. Exporting unfinished metal concentrate deprives the nation of its full value and potential.

In Saindak, the entire output is sent to China for refining. Recently, MCC (Metallurgical Corporation of China) has been given an extension to mine for another decade. The same mistake should not be repeated at Reko Diq. At least our share of the concentration should be refined and utilized locally.

As refining is power intensive metal finishing can be carried out at Thar where inexpensive power is available. RDMC (Reko Diq Mining Company) can mine and then produce the concentrate, which should be then handed over to a local entity created under public-private partnership for producing finished metal.

Past mistakes should not be repeated again and again. Industrialization is carried out with national needs in mind.

The import bill has to be slashed. Long-term sustainability comes with self-reliance. It is time to look inwards to build on our potential by effective utilization of indigenous resources. The development of Thar has been a game changer. The slogan is “Thar Badlay Ga Pakistan “. Reko Dig has the potential to bring Pakistan on the world copper map. Exporting unfinished metal does not serve national interests and should be avoided.

RDC was folded into SML (Saindak Metals Limited) which is now located in Quetta. TCC was based in Islamabad and Karachi. RMDC will probably be located in Islamabad and Quetta. SECMC operates from Karachi. In Lahore, the Punjab Mining Company is leading the charge. Projects can be started in Kalabagh and Chiniot.

A private sector consortium (National Resources Limited) headed by Shamasuddin Sheikh, the former head of SECMC, is also desirous to start mining at Reko Diq, which is a welcome development. The ‘minerals’ summit’ last year in Islamabad brought all players together but the progress so far has been slow. It is time to revisit the plans that were formulated and deliberated upon during the sessions.

The Planning Commission (PC) should focus on the metal needs of the nation, which are currently being imported in the finished form. Infra-structure development to ship out un-finished concentrates has to be avoided in best national interests. Thar has the potential of resolving our energy needs, which is essential for refining of metals.

After copper the next candidate is chromium, which is a strategic metal abundantly available in Baluchistan which is currently being exported in a mined form at a very low return. Value-addition is the name of the game, which leads to prosperity of the nation.

Lessons have to be learnt from the Chinese model of development where priorities were set as under: Fulfillment of national needs, Import Substitution and then Exports. The order is important for developing countries to enter the ranks of the developed.

Copyright Business Recorder, 2024

Dr Farid A Malik

The writer is Ex-Chairman Pakistan Science Foundation; email:[email protected]

Comments

Comments are closed.

Sugon Dzntz Jan 17, 2024 11:15am
"Exporting unfinished metal does not serve national interests and should be avoided." Totally agreed, Pakistan should start R&D in EV motors and related electrical technologies. We didn't take a part when ICE vehicles technology was at rise, we should make name in EV sector
thumb_up Recommended (0)
Atif Sarwar Malik Jan 17, 2024 12:56pm
We must setup copper and gold refinery in Pakistan. State if Pakistan must facilitate local investors for the purpose .
thumb_up Recommended (0)
M.KHALID Jan 17, 2024 01:07pm
. better to ask mines owners to establish the refineries and export value added only rather then raw material.
thumb_up Recommended (0)
Syed Athar Ali Jan 17, 2024 04:53pm
Saindak copper Gold mining project has been smelting Cu,Au and producing 99.9% finished product
thumb_up Recommended (0)
Surfer Jan 18, 2024 04:49am
How original - ship rocks weighing hundreds of tons outside the country and import the metals back. How would this help the country. It is the worst possible arrangement. Why can't you set up plants to extract the metal onsite.
thumb_up Recommended (0)
Chawla.i Jan 18, 2024 08:43am
It is highly recommended to investigate saindak project through best renowned Pakistani chartered accountants with the help of A G of Pakistan to go deep what blunder they MCC have cruelly done to Pakistan as the fighure must b in 10bil USD or assign me this task to prove that.. Long live Pakistan, gdluck Pakistan
thumb_up Recommended (0)
Chawla.i Jan 18, 2024 08:51am
Saindak project has falsified all precious minerals which CU ore contains and once made copper mattel which it exports must be taken samples and sent to best laboratories to recheck and made a proper case in front of china government to get refunded our hardened foreign earnings which r taken from our natural resources Tens of billions of dollars....GHQ should b tasked to dig this matter....on urgent basis in d best national interest... gdluck Pakistan..GHQ zindabaad
thumb_up Recommended (0)