AGL 38.48 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 203.02 Decreased By ▼ -4.75 (-2.29%)
BOP 10.17 Increased By ▲ 0.11 (1.09%)
CNERGY 6.54 Decreased By ▼ -0.54 (-7.63%)
DCL 9.58 Decreased By ▼ -0.41 (-4.1%)
DFML 40.02 Decreased By ▼ -1.12 (-2.72%)
DGKC 98.08 Decreased By ▼ -5.38 (-5.2%)
FCCL 34.96 Decreased By ▼ -1.39 (-3.82%)
FFBL 86.43 Decreased By ▼ -5.16 (-5.63%)
FFL 13.90 Decreased By ▼ -0.70 (-4.79%)
HUBC 131.57 Decreased By ▼ -7.86 (-5.64%)
HUMNL 14.02 Decreased By ▼ -0.08 (-0.57%)
KEL 5.61 Decreased By ▼ -0.36 (-6.03%)
KOSM 7.27 Decreased By ▼ -0.59 (-7.51%)
MLCF 45.59 Decreased By ▼ -1.69 (-3.57%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.76 Decreased By ▼ -1.90 (-0.85%)
PAEL 38.48 Increased By ▲ 0.37 (0.97%)
PIBTL 8.91 Decreased By ▼ -0.36 (-3.88%)
PPL 197.88 Decreased By ▼ -7.97 (-3.87%)
PRL 39.03 Decreased By ▼ -0.82 (-2.06%)
PTC 25.47 Decreased By ▼ -1.15 (-4.32%)
SEARL 103.05 Decreased By ▼ -7.19 (-6.52%)
TELE 9.02 Decreased By ▼ -0.21 (-2.28%)
TOMCL 36.41 Decreased By ▼ -1.80 (-4.71%)
TPLP 13.75 Decreased By ▼ -0.02 (-0.15%)
TREET 25.12 Decreased By ▼ -1.33 (-5.03%)
TRG 58.04 Decreased By ▼ -2.50 (-4.13%)
UNITY 33.67 Decreased By ▼ -0.47 (-1.38%)
WTL 1.71 Decreased By ▼ -0.17 (-9.04%)
BR100 11,896 Decreased By -402.5 (-3.27%)
BR30 37,383 Decreased By -1494.9 (-3.85%)
KSE100 111,070 Decreased By -3790.4 (-3.3%)
KSE30 34,909 Decreased By -1287 (-3.56%)

LAHORE: Chief Minister Punjab Mohsin Naqvi laid the foundation stone of the signal-free corridor project from Pirwadhai Mor up to Kutchery Chowk. The 7.6km long signal-free corridor mega project will cost Rs8.2 billion and will reduce traffic load on the busiest intersections of Rawalpindi.

In this project, three underpasses and two protected U-turns will be built under the project. A single barrel underpass at Qasim Market and double barrel underpasses at GPO Chowk and PC Chowk will be built.

Mohsin Naqvi launched the construction work at the Asghar Mall Road. Asghar Mall Road is being reconstructed stretching from Murree Road up to Chungi Number 04. He vowed that they would strive to the utmost to complete Asghar Mall Road before the stipulated timeline. The cleaning of local locality sewerage lines surrounding the road will be ensured so that the locality water does not accumulate on the road. Moreover, the CM inaugurated the Metro Bus Saskath Road Station, Gymkhana and Allama Iqbal e-Library in Rawalpindi.

The Saskath Road Metro Station was badly damaged during arson in the 9th May incidents. On the direction of CM, repair and renovation of the station has been undertaken. He visited the Saskath Road Metro Station and conversed with the staff members present at the ticket counter. The CM while appreciating rehabilitation work of the Metro station apprised that 10,000 citizens commute on the Metro Bus service from the Saskath Road station daily.

Copyright Business Recorder, 2024

Comments

Comments are closed.