AIRLINK 205.81 Increased By ▲ 5.52 (2.76%)
BOP 10.24 Decreased By ▼ -0.25 (-2.38%)
CNERGY 7.06 Decreased By ▼ -0.15 (-2.08%)
FCCL 34.66 Decreased By ▼ -0.28 (-0.8%)
FFL 17.10 Decreased By ▼ -0.32 (-1.84%)
FLYNG 24.68 Decreased By ▼ -0.17 (-0.68%)
HUBC 131.18 Increased By ▲ 3.37 (2.64%)
HUMNL 13.98 Increased By ▲ 0.17 (1.23%)
KEL 4.91 Decreased By ▼ -0.09 (-1.8%)
KOSM 6.81 Decreased By ▼ -0.22 (-3.13%)
MLCF 44.34 Decreased By ▼ -0.28 (-0.63%)
OGDC 221.77 Decreased By ▼ -0.38 (-0.17%)
PACE 7.22 Decreased By ▼ -0.20 (-2.7%)
PAEL 42.69 Decreased By ▼ -0.11 (-0.26%)
PIAHCLA 17.13 Decreased By ▼ -0.26 (-1.5%)
PIBTL 8.42 Decreased By ▼ -0.09 (-1.06%)
POWER 9.09 Decreased By ▼ -0.06 (-0.66%)
PPL 190.86 Decreased By ▼ -1.87 (-0.97%)
PRL 43.49 Increased By ▲ 1.99 (4.8%)
PTC 24.79 Increased By ▲ 0.35 (1.43%)
SEARL 102.66 Increased By ▲ 1.39 (1.37%)
SILK 1.02 Decreased By ▼ -0.03 (-2.86%)
SSGC 42.74 Decreased By ▼ -1.13 (-2.58%)
SYM 18.40 Decreased By ▼ -0.36 (-1.92%)
TELE 9.26 Decreased By ▼ -0.28 (-2.94%)
TPLP 13.15 Increased By ▲ 0.07 (0.54%)
TRG 68.78 Increased By ▲ 2.59 (3.91%)
WAVESAPP 10.42 Decreased By ▼ -0.11 (-1.04%)
WTL 1.80 Increased By ▲ 0.02 (1.12%)
YOUW 4.00 Decreased By ▼ -0.04 (-0.99%)
BR100 12,034 Decreased By -5.6 (-0.05%)
BR30 36,777 Increased By 88.7 (0.24%)
KSE100 114,496 Decreased By -308.5 (-0.27%)
KSE30 36,003 Decreased By -99.2 (-0.27%)

Pakistan Petroleum Limited (PPL), a key supplier of natural gas in the county, has successfully drilled and tested hydrocarbon reserves in Adam-2 well, located in Adam D&PL Area, Hala Block, Sindh.

The E&P shared the development in its notice to the Pakistan Stock Exchange (PSX) on Tuesday.

“We wish to inform that as part of the field development activities in the Adam D&PL area, Hala JV has successfully drilled and tested Adam-2 well,” read the notice.

Hala JV is a joint venture between PPL and Mari Petroleum Company Limited (MPCL), with 65% and 35% working interest, respectively, and PPL as operator. With an area of about 395 square kilometres, the block straddles the Sanghar and Matiari districts in Sindh.

PPL said that Adam-2 well was a challenging development with associated risks and uncertainties.

“The well was drilled down to a depth of 3,421 meters and tested at approximately 6 million standard cubic feet per day (MMSCFD) gas and 450 barrels per day (BPD) condensate with a Wellhead Flowing Pressure (WHFP) of approximately 740 pounds per square inch (Psi) at 32/64-inch choke size,” read the notice.

PPL said that after tie-in, the gas will be processed at Hala Gas Processing Facility for onward supply to Sui Southern Gas Company Limited (SSGCL).

“The development well will add hydrocarbon reserves, enable the energy sector to reduce the gap between the supply and demand of oil and gas during the current energy crisis in the country and will save significant foreign exchange for the country,” read the notice.

Last week, the Board of Directors (BoD) of PPL approved, in-principle, funding of the Government of Balochistan’s (GoB) share of capital contribution in the BLZ Project.

“PPL shall arrange funding, from its cashflows, for GoB’s capital contribution through a financing arrangement. Debt servicing would be through GoB’s share of project cashflows,” read the notice back then.

Comments

Comments are closed.