AIRLINK 204.45 Increased By ▲ 3.55 (1.77%)
BOP 10.09 Decreased By ▼ -0.06 (-0.59%)
CNERGY 6.91 Increased By ▲ 0.03 (0.44%)
FCCL 34.83 Increased By ▲ 0.74 (2.17%)
FFL 17.21 Increased By ▲ 0.23 (1.35%)
FLYNG 24.52 Increased By ▲ 0.48 (2%)
HUBC 137.40 Increased By ▲ 5.70 (4.33%)
HUMNL 13.82 Increased By ▲ 0.06 (0.44%)
KEL 4.91 Increased By ▲ 0.10 (2.08%)
KOSM 6.70 No Change ▼ 0.00 (0%)
MLCF 44.31 Increased By ▲ 0.98 (2.26%)
OGDC 221.91 Increased By ▲ 3.16 (1.44%)
PACE 7.09 Increased By ▲ 0.11 (1.58%)
PAEL 42.97 Increased By ▲ 1.43 (3.44%)
PIAHCLA 17.08 Increased By ▲ 0.01 (0.06%)
PIBTL 8.59 Decreased By ▼ -0.06 (-0.69%)
POWER 9.02 Decreased By ▼ -0.09 (-0.99%)
PPL 190.60 Increased By ▲ 3.48 (1.86%)
PRL 43.04 Increased By ▲ 0.98 (2.33%)
PTC 25.04 Increased By ▲ 0.05 (0.2%)
SEARL 106.41 Increased By ▲ 6.11 (6.09%)
SILK 1.02 Increased By ▲ 0.01 (0.99%)
SSGC 42.91 Increased By ▲ 0.58 (1.37%)
SYM 18.31 Increased By ▲ 0.33 (1.84%)
TELE 9.14 Increased By ▲ 0.03 (0.33%)
TPLP 13.11 Increased By ▲ 0.18 (1.39%)
TRG 68.13 Decreased By ▼ -0.22 (-0.32%)
WAVESAPP 10.24 Decreased By ▼ -0.05 (-0.49%)
WTL 1.87 Increased By ▲ 0.01 (0.54%)
YOUW 4.09 Decreased By ▼ -0.04 (-0.97%)
BR100 12,137 Increased By 188.4 (1.58%)
BR30 37,146 Increased By 778.3 (2.14%)
KSE100 115,272 Increased By 1435.3 (1.26%)
KSE30 36,311 Increased By 549.3 (1.54%)

LAHORE: A bicycle manufacturer has failed to fulfill the conditions prescribed for claiming input tax adjustment against local procurement of raw materials for manufacturing purposes, said Inland Revenue sources.

It may be noted that the relevant SRO declared supply of bicycles chargeable to zero percent tax. However, the availability of Input-Output Co-efficient Organization (IOCO) was essential for claiming benefit of statutory instrument. Though, this condition doesn’t apply in case of import of finished goods and their supply in same state.

But the bicycle manufacturer pleaded that he had sought issuance of IOCO certificate, however, procurement thereof was unnecessarily delayed and compelled him to procurement raw materials for manufacturing.

The department, on the other hand, stressed that the determination of input/output ratios is a necessary requirement and a fundamental-cum-primary condition for claiming the privilege of zero-rating facility. The requirement of determination of input/output ratios and would be deemed fulfilled if Commissioner IOCO has either approved it or is otherwise available in terms of the alternatives provided in the relevant SRO.

According to the departmental sources, for import and local procurement of raw materials, packing materials, sub-components, components, sub-assemblies and assemblies for the manufacture of the goods, the Commissioner shall approve the declaration of input-output ratio of the manufacturer without physical verification in case the declared input-output ratio and input requirement is in accordance with the prevailing industry average or the inputs consumption pattern of the applicant manufacturer or as already determined by IOCO under an earlier notification issued for such goods.

They have added that in case the Commissioner is not satisfied with the declared input-output ratios of the goods to be manufactured because of their being prima facie not in accordance with the prevalent average of the relevant industry or in case the input-output ratios are not already determined by IOCO, he may, after allowing a six months provisional quantity, make a reference to the IOCO for final determination thereof.

On receipt of report from IOCO the Commissioner shall then determine the final annual quantitative entitlement of inputs and grant final approval for zero-rated purchases or imports.

In case of non-receipt of report from IOCO within four months of the application made by manufacturer, the Commissioner shall provisionally allow another six months quantity to the applicant manufacturer.

Copyright Business Recorder, 2024

Comments

Comments are closed.