AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

TOKYO: Tokyo Electric Power Co will start loading nuclear fuel into reactor No. 7 at its Kashiwazaki-Kariwa power station on Monday, it said in a statement, as it prepares for safety tests seeking to restart the world’s biggest nuclear plant.

The Kashiwazaki-Kariwa plant has been offline since 2012 after another Tepco plant in Fukushima was hit by a tsunami a year earlier which led to the shutdown of all nuclear plants in Japan at the time.

Tepco said on Monday that Japan’s Nuclear Regulation Authority has granted the company approval to test safety of the Kashiwazaki-Kariwa’s equipment, and it plans to begin loading nuclear fuel into reactor No.7 later in the day.

Tepco seeks regulatory approval to load nuclear fuel into Kashiwazaki-Kariwa plant

Tepco needs consent from Niigata prefecture, where the plant is located, to resume operations.

The prefecture governor said last month more talks were needed over the possible restart, suggesting operations may not resume quickly.

Tepco’s shares were 6% up in Tokyo midday trading following the approval, outperforming the Nikkei index which was 1% down.

Comments

Comments are closed.