AGL 38.50 Increased By ▲ 0.93 (2.48%)
AIRLINK 131.71 Decreased By ▼ -0.79 (-0.6%)
BOP 5.59 Decreased By ▼ -0.05 (-0.89%)
CNERGY 3.84 Increased By ▲ 0.07 (1.86%)
DCL 8.71 Decreased By ▼ -0.16 (-1.8%)
DFML 40.80 Decreased By ▼ -0.20 (-0.49%)
DGKC 88.70 Decreased By ▼ -1.46 (-1.62%)
FCCL 35.29 Increased By ▲ 0.21 (0.6%)
FFBL 66.41 Decreased By ▼ -0.09 (-0.14%)
FFL 10.49 Increased By ▲ 0.34 (3.35%)
HUBC 109.70 Increased By ▲ 3.30 (3.1%)
HUMNL 14.66 Increased By ▲ 1.26 (9.4%)
KEL 4.83 Decreased By ▼ -0.03 (-0.62%)
KOSM 7.10 Increased By ▲ 0.25 (3.65%)
MLCF 42.55 Increased By ▲ 0.75 (1.79%)
NBP 59.49 Increased By ▲ 0.91 (1.55%)
OGDC 184.21 Increased By ▲ 2.96 (1.63%)
PAEL 25.59 Decreased By ▼ -0.11 (-0.43%)
PIBTL 5.90 Increased By ▲ 0.07 (1.2%)
PPL 147.80 Decreased By ▼ -0.60 (-0.4%)
PRL 23.58 Increased By ▲ 0.36 (1.55%)
PTC 16.45 Increased By ▲ 1.21 (7.94%)
SEARL 69.22 Increased By ▲ 0.43 (0.63%)
TELE 7.23 Decreased By ▼ -0.01 (-0.14%)
TOMCL 36.09 Increased By ▲ 0.09 (0.25%)
TPLP 7.56 Increased By ▲ 0.16 (2.16%)
TREET 14.19 Decreased By ▼ -0.05 (-0.35%)
TRG 50.90 Increased By ▲ 0.05 (0.1%)
UNITY 26.89 Increased By ▲ 0.49 (1.86%)
WTL 1.23 Increased By ▲ 0.02 (1.65%)
BR100 9,828 Increased By 60.4 (0.62%)
BR30 29,808 Increased By 407.9 (1.39%)
KSE100 92,377 Increased By 439.4 (0.48%)
KSE30 28,829 Increased By 85.7 (0.3%)

TOKYO: Tokyo Electric Power Co will start loading nuclear fuel into reactor No. 7 at its Kashiwazaki-Kariwa power station on Monday, it said in a statement, as it prepares for safety tests seeking to restart the world’s biggest nuclear plant.

The Kashiwazaki-Kariwa plant has been offline since 2012 after another Tepco plant in Fukushima was hit by a tsunami a year earlier which led to the shutdown of all nuclear plants in Japan at the time.

Tepco said on Monday that Japan’s Nuclear Regulation Authority has granted the company approval to test safety of the Kashiwazaki-Kariwa’s equipment, and it plans to begin loading nuclear fuel into reactor No.7 later in the day.

Tepco seeks regulatory approval to load nuclear fuel into Kashiwazaki-Kariwa plant

Tepco needs consent from Niigata prefecture, where the plant is located, to resume operations.

The prefecture governor said last month more talks were needed over the possible restart, suggesting operations may not resume quickly.

Tepco’s shares were 6% up in Tokyo midday trading following the approval, outperforming the Nikkei index which was 1% down.

Comments

Comments are closed.