AGL 38.50 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 205.00 Decreased By ▼ -2.77 (-1.33%)
BOP 10.02 Decreased By ▼ -0.04 (-0.4%)
CNERGY 6.65 Decreased By ▼ -0.43 (-6.07%)
DCL 9.67 Decreased By ▼ -0.32 (-3.2%)
DFML 40.40 Decreased By ▼ -0.74 (-1.8%)
DGKC 100.51 Decreased By ▼ -2.95 (-2.85%)
FCCL 35.16 Decreased By ▼ -1.19 (-3.27%)
FFBL 86.83 Decreased By ▼ -4.76 (-5.2%)
FFL 14.00 Decreased By ▼ -0.60 (-4.11%)
HUBC 133.90 Decreased By ▼ -5.53 (-3.97%)
HUMNL 14.01 Decreased By ▼ -0.09 (-0.64%)
KEL 5.69 Decreased By ▼ -0.28 (-4.69%)
KOSM 7.44 Decreased By ▼ -0.42 (-5.34%)
MLCF 46.25 Decreased By ▼ -1.03 (-2.18%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.50 Decreased By ▼ -2.16 (-0.97%)
PAEL 39.18 Increased By ▲ 1.07 (2.81%)
PIBTL 8.92 Decreased By ▼ -0.35 (-3.78%)
PPL 199.05 Decreased By ▼ -6.80 (-3.3%)
PRL 40.29 Increased By ▲ 0.44 (1.1%)
PTC 25.80 Decreased By ▼ -0.82 (-3.08%)
SEARL 102.99 Decreased By ▼ -7.25 (-6.58%)
TELE 9.09 Decreased By ▼ -0.14 (-1.52%)
TOMCL 36.80 Decreased By ▼ -1.41 (-3.69%)
TPLP 14.00 Increased By ▲ 0.23 (1.67%)
TREET 25.45 Decreased By ▼ -1.00 (-3.78%)
TRG 58.50 Decreased By ▼ -2.04 (-3.37%)
UNITY 33.70 Decreased By ▼ -0.44 (-1.29%)
WTL 1.73 Decreased By ▼ -0.15 (-7.98%)
BR100 11,954 Decreased By -344.9 (-2.8%)
BR30 37,540 Decreased By -1337.7 (-3.44%)
KSE100 111,670 Decreased By -3190.5 (-2.78%)
KSE30 35,119 Decreased By -1076.7 (-2.97%)

KARACHI: Mari Petroleum Company Limited (MPCL) has successfully drilled and tested the third appraisal well in the Ghazij formation in the Mari Development and Production Lease (D&PL) in Sindh.

This well is a part of the appraisal programme for the Ghazij discovery which was disclosed on January 25, 2023.

The well was spudded in on February 15, 2024, and drilled down to a depth of 1,483 meters. The post-acid gas flow rate from the well was 10.5 Million Standard Cubic Feet per Day (MMSCFD) with a WellHead Flowing Pressure (WHFP) of 490 pounds per square inch (Psi) at 64/64-inch choke size, material information sent to Pakistan Stock Exchange on Thursday said.

The well shall be put on production in due course after completion of requisite regulatory formalities.

Copyright Business Recorder, 2024

Comments

Comments are closed.