AIRLINK 157.41 Decreased By ▼ -6.97 (-4.24%)
BOP 10.37 Decreased By ▼ -0.20 (-1.89%)
CNERGY 8.32 Decreased By ▼ -0.08 (-0.95%)
CPHL 92.89 Increased By ▲ 2.93 (3.26%)
FCCL 46.73 Decreased By ▼ -0.21 (-0.45%)
FFL 14.88 Decreased By ▼ -0.36 (-2.36%)
FLYNG 26.98 Increased By ▲ 0.65 (2.47%)
HUBC 134.01 Decreased By ▼ -2.36 (-1.73%)
HUMNL 12.52 Decreased By ▼ -0.49 (-3.77%)
KEL 4.21 Decreased By ▼ -0.07 (-1.64%)
KOSM 5.39 Decreased By ▼ -0.22 (-3.92%)
MLCF 60.88 Increased By ▲ 0.09 (0.15%)
OGDC 208.52 Decreased By ▼ -6.37 (-2.96%)
PACE 5.40 Decreased By ▼ -0.14 (-2.53%)
PAEL 40.78 Decreased By ▼ -1.22 (-2.9%)
PIAHCLA 18.80 Increased By ▲ 1.06 (5.98%)
PIBTL 9.98 Decreased By ▼ -0.25 (-2.44%)
POWER 11.96 Increased By ▲ 0.06 (0.5%)
PPL 168.77 Decreased By ▼ -5.45 (-3.13%)
PRL 35.03 Decreased By ▼ -0.51 (-1.44%)
PTC 22.99 Increased By ▲ 0.05 (0.22%)
SEARL 93.10 Decreased By ▼ -1.94 (-2.04%)
SSGC 35.57 Decreased By ▼ -1.04 (-2.84%)
SYM 13.66 Decreased By ▼ -0.27 (-1.94%)
TELE 6.95 Decreased By ▼ -0.29 (-4.01%)
TPLP 10.00 Decreased By ▼ -0.27 (-2.63%)
TRG 60.67 Decreased By ▼ -0.86 (-1.4%)
WAVESAPP 9.70 Decreased By ▼ -0.62 (-6.01%)
WTL 1.30 Decreased By ▼ -0.02 (-1.52%)
YOUW 3.65 Decreased By ▼ -0.04 (-1.08%)
BR100 12,239 Decreased By -154.2 (-1.24%)
BR30 36,393 Decreased By -714.3 (-1.92%)
KSE100 114,153 Decreased By -1379.3 (-1.19%)
KSE30 35,200 Decreased By -461.3 (-1.29%)

ISLAMABAD: The National Highways Authority (NHA) Executive Board recommended the PC-I (Land Acquisition) of China–Pakistan Economic Corridor (CPEC) KKH Phase-II (Thakot to Raikot) at a cost of Rs4.133 billion for approval of Executive Committee of National Economic Council (ECNEC).

Official documents revealed that Arshad Majeed Mohmand, chairman NHA presided over the meeting which deliberated on PC-I (Land Acquisition) CPEC KKH Phase-II (Thakot to Raikot) with a total length of 241km. The board recommended the PC-1 for approval of the ECNEC.

The NHA Executive Board recommended the “PC-I for Construction of Motorway from Ghulam Khan to Esa Khel (165.410 km)” at a cost of Rs117.469 billion for approval of Central Development Working Party (CDWP)/ ECNEC.

The NHA Executive Board also recommended the “PC-I Construction Quetta–Dhadar Section of N-65 (110.256 km)” at a cost of Rs55.379 billion for approval of CDWP/ECNEC.

The NHA Executive Board recommended the “PC-I for Dualisation and Strengthening of Dhadar–Jacobabad Section of N–65 (188 km)” at a cost of Rs50,824.93 million for approval of CDWP/ ECNEC.

The board recommended the “PC-I for Construction of Kharan–Basima Highway (123 km)” at a cost of Rs63.400 billion for approval of CDWP/ ECNEC. The NHA Executive Board recommended the “PC-I for Construction of Wangu Hill Tunnel on M-8 (22 km)” at a cost of Rs62,258.408 million for approval of CDWP/ ECNEC.

The board also recommended “PC-I of Electrical & Mechanical (E&M) works, operational buildings, bridges of Access Roads (PKG-II) and pending liability of Lowari Tunnel Project” amounting to Rs37.257 billion for approval of CDWP/ECNEC. The NHA will ensure third party validation prior to presenting this PC-I before CDWP.

Copyright Business Recorder, 2024

Comments

Comments are closed.