AIRLINK 90.15 Increased By ▲ 1.42 (1.6%)
BOP 5.41 Increased By ▲ 0.34 (6.71%)
CNERGY 3.96 Increased By ▲ 0.09 (2.33%)
DFML 42.07 Decreased By ▼ -1.08 (-2.5%)
DGKC 90.20 Decreased By ▼ -0.28 (-0.31%)
FCCL 23.00 Increased By ▲ 0.32 (1.41%)
FFBL 38.00 Decreased By ▼ -0.15 (-0.39%)
FFL 9.30 Increased By ▲ 0.10 (1.09%)
GGL 9.70 Increased By ▲ 0.12 (1.25%)
HASCOL 6.10 Increased By ▲ 0.07 (1.16%)
HBL 132.50 Increased By ▲ 6.50 (5.16%)
HUBC 167.30 Increased By ▲ 3.30 (2.01%)
HUMNL 10.78 Increased By ▲ 0.16 (1.51%)
KEL 4.72 Increased By ▲ 0.01 (0.21%)
KOSM 4.18 Decreased By ▼ -0.07 (-1.65%)
MLCF 38.25 Increased By ▲ 0.45 (1.19%)
OGDC 136.79 Increased By ▲ 0.79 (0.58%)
PAEL 26.75 Increased By ▲ 1.75 (7%)
PIBTL 6.20 No Change ▼ 0.00 (0%)
PPL 124.68 Increased By ▲ 0.91 (0.74%)
PRL 23.85 Increased By ▲ 0.64 (2.76%)
PTC 12.30 Decreased By ▼ -0.33 (-2.61%)
SEARL 59.05 Increased By ▲ 0.37 (0.63%)
SNGP 68.11 Increased By ▲ 2.01 (3.04%)
SSGC 9.98 Increased By ▲ 0.16 (1.63%)
TELE 8.09 Increased By ▲ 0.49 (6.45%)
TPLP 8.90 Increased By ▲ 0.05 (0.56%)
TRG 62.00 Decreased By ▼ -0.30 (-0.48%)
UNITY 31.95 Increased By ▲ 0.66 (2.11%)
WTL 1.28 No Change ▼ 0.00 (0%)
BR100 8,508 Increased By 79.7 (0.95%)
BR30 27,459 Increased By 495.3 (1.84%)
KSE100 80,234 Increased By 680.8 (0.86%)
KSE30 25,799 Increased By 215.8 (0.84%)

KARACHI: Pakistan Civil Aviation Authority (PCAA) is planning to commence the reconstruction of main runway (07L/25R) of Jinnah International Airport (JIAP) in the third week of current month.

For the purpose, PCAA has signed a contract for reconstruction of JIAP’s main runway (07L/25R) in a ceremony held at the PCAA Headquarters.

According to the PCAA, the reconstruction of main runway, starting soon after Eid, will enhance airside infrastructure bringing about significant advantages. The advantages include the ability to seamlessly accommodate wide body aircraft up to category 4F (including A380), improved safety, reliability, and the capacity to handle the growing passenger and aircraft traffic.

This upgrade is expected to attract both domestic and international airlines to operate at JIAP in the future. Upon completion of the upgrade, it will feature the latest energy-efficient LED CAT-I Airfield Lighting System with Runway Centreline Lights.

The upgrade project also includes extension of runway by 1000 feet making it 11500 feet. Reconstruction of taxiways and overruns at both ends, and asphaltic overlay of four taxi links near 07L end.

Copyright Business Recorder, 2024

Comments

Comments are closed.