AGL 37.25 No Change ▼ 0.00 (0%)
AIRLINK 123.41 Decreased By ▼ -0.61 (-0.49%)
BOP 5.89 Increased By ▲ 0.27 (4.8%)
CNERGY 3.72 No Change ▼ 0.00 (0%)
DCL 8.43 Increased By ▲ 0.18 (2.18%)
DFML 40.70 Increased By ▲ 0.43 (1.07%)
DGKC 86.20 Increased By ▲ 0.46 (0.54%)
FCCL 33.20 Increased By ▲ 0.60 (1.84%)
FFBL 66.15 Decreased By ▼ -0.35 (-0.53%)
FFL 10.19 Increased By ▲ 0.03 (0.3%)
HUBC 104.56 Increased By ▲ 1.46 (1.42%)
HUMNL 13.35 Decreased By ▼ -0.05 (-0.37%)
KEL 4.26 Increased By ▲ 0.01 (0.24%)
KOSM 7.25 Increased By ▲ 0.07 (0.97%)
MLCF 38.60 Increased By ▲ 0.30 (0.78%)
NBP 63.70 Decreased By ▼ -1.31 (-2.02%)
OGDC 174.68 Increased By ▲ 0.88 (0.51%)
PAEL 25.13 Increased By ▲ 0.23 (0.92%)
PIBTL 5.80 No Change ▼ 0.00 (0%)
PPL 142.50 Decreased By ▼ -0.20 (-0.14%)
PRL 23.05 Increased By ▲ 0.07 (0.3%)
PTC 15.46 Increased By ▲ 0.35 (2.32%)
SEARL 65.69 Increased By ▲ 0.34 (0.52%)
TELE 7.02 Increased By ▲ 0.02 (0.29%)
TOMCL 36.56 Decreased By ▼ -0.35 (-0.95%)
TPLP 7.30 Decreased By ▼ -0.04 (-0.54%)
TREET 14.20 Decreased By ▼ -0.08 (-0.56%)
TRG 50.88 Increased By ▲ 1.18 (2.37%)
UNITY 26.70 Increased By ▲ 0.55 (2.1%)
WTL 1.24 No Change ▼ 0.00 (0%)
BR100 9,640 Increased By 38.8 (0.4%)
BR30 28,770 Increased By 196.9 (0.69%)
KSE100 90,654 Increased By 367.7 (0.41%)
KSE30 28,343 Increased By 0.1 (0%)

PESHAWAR: Secretary Energy and Power Nisar Ahmad Khan called foreign investment as a milestone in the coming days for the development of the energy sector in the province.

The senior official said that the natural resources of hydropower found in Khyber Pakhtunkhwa are a valuable treasure here, which if not utilized will only save the country from the current energy crisis and can be extracted, but the province will also get billions of rupees annually from energy projects.

He expressed these views regarding the progress of the 470 MW Lower Spat Gah Power Project in Kohistan district with the cooperation of KHNP, a state-owned company working in the energy sector of South Korea, and the Khyber Pakhtunkhwa government under the leadership of Wan Seok, Bae, the chief executive officer of the Korean engineering and construction company LSG Hydropower Ltd.

The project will be completed in 5 years, which is the largest in the history of the province. The meeting discussed the issues faced at the federal level with NEPRA including IGCEP Plan and NTDC.

Copyright Business Recorder, 2024

Comments

Comments are closed.