AGL 37.50 Increased By ▲ 0.92 (2.52%)
AIRLINK 217.38 Increased By ▲ 1.64 (0.76%)
BOP 10.47 Increased By ▲ 0.99 (10.44%)
CNERGY 7.44 Increased By ▲ 0.92 (14.11%)
DCL 9.01 Increased By ▲ 0.40 (4.65%)
DFML 41.34 Increased By ▲ 0.30 (0.73%)
DGKC 106.06 Increased By ▲ 7.08 (7.15%)
FCCL 37.52 Increased By ▲ 1.18 (3.25%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 17.26 Increased By ▲ 0.18 (1.05%)
HUBC 129.71 Increased By ▲ 3.37 (2.67%)
HUMNL 14.02 Increased By ▲ 0.58 (4.32%)
KEL 5.41 Increased By ▲ 0.18 (3.44%)
KOSM 7.17 Increased By ▲ 0.34 (4.98%)
MLCF 46.38 Increased By ▲ 2.28 (5.17%)
NBP 65.66 Increased By ▲ 5.97 (10%)
OGDC 225.46 Increased By ▲ 4.36 (1.97%)
PAEL 44.52 Increased By ▲ 3.99 (9.84%)
PIBTL 8.38 Increased By ▲ 0.30 (3.71%)
PPL 198.96 Increased By ▲ 7.43 (3.88%)
PRL 40.46 Increased By ▲ 1.91 (4.95%)
PTC 27.30 Increased By ▲ 0.30 (1.11%)
SEARL 106.29 Increased By ▲ 1.96 (1.88%)
TELE 9.63 Increased By ▲ 1.00 (11.59%)
TOMCL 35.65 Increased By ▲ 0.69 (1.97%)
TPLP 15.07 Increased By ▲ 1.37 (10%)
TREET 25.63 Increased By ▲ 0.74 (2.97%)
TRG 70.45 Decreased By ▼ -3.10 (-4.21%)
UNITY 33.55 Increased By ▲ 0.28 (0.84%)
WTL 1.83 Increased By ▲ 0.12 (7.02%)
BR100 12,391 Increased By 403.8 (3.37%)
BR30 38,407 Increased By 1229.1 (3.31%)
KSE100 115,259 Increased By 3907.8 (3.51%)
KSE30 36,300 Increased By 1260.9 (3.6%)

PESHAWAR: Secretary Energy and Power Nisar Ahmad Khan called foreign investment as a milestone in the coming days for the development of the energy sector in the province.

The senior official said that the natural resources of hydropower found in Khyber Pakhtunkhwa are a valuable treasure here, which if not utilized will only save the country from the current energy crisis and can be extracted, but the province will also get billions of rupees annually from energy projects.

He expressed these views regarding the progress of the 470 MW Lower Spat Gah Power Project in Kohistan district with the cooperation of KHNP, a state-owned company working in the energy sector of South Korea, and the Khyber Pakhtunkhwa government under the leadership of Wan Seok, Bae, the chief executive officer of the Korean engineering and construction company LSG Hydropower Ltd.

The project will be completed in 5 years, which is the largest in the history of the province. The meeting discussed the issues faced at the federal level with NEPRA including IGCEP Plan and NTDC.

Copyright Business Recorder, 2024

Comments

Comments are closed.