AIRLINK 194.01 Increased By ▲ 0.51 (0.26%)
BOP 9.77 Increased By ▲ 0.13 (1.35%)
CNERGY 7.62 Increased By ▲ 0.09 (1.2%)
FCCL 38.05 Increased By ▲ 0.35 (0.93%)
FFL 15.70 Increased By ▲ 0.10 (0.64%)
FLYNG 26.05 Increased By ▲ 0.46 (1.8%)
HUBC 128.30 Increased By ▲ 1.23 (0.97%)
HUMNL 13.55 Increased By ▲ 0.05 (0.37%)
KEL 4.62 Increased By ▲ 0.04 (0.87%)
KOSM 6.27 Increased By ▲ 0.17 (2.79%)
MLCF 44.45 Increased By ▲ 0.49 (1.11%)
OGDC 206.25 Increased By ▲ 3.01 (1.48%)
PACE 6.46 Increased By ▲ 0.06 (0.94%)
PAEL 40.90 Decreased By ▼ -0.08 (-0.2%)
PIAHCLA 17.42 Decreased By ▼ -0.07 (-0.4%)
PIBTL 7.76 Increased By ▲ 0.10 (1.31%)
POWER 9.10 Increased By ▲ 0.02 (0.22%)
PPL 178.10 Increased By ▲ 3.85 (2.21%)
PRL 38.35 Increased By ▲ 0.28 (0.74%)
PTC 24.40 Increased By ▲ 0.33 (1.37%)
SEARL 107.60 Increased By ▲ 0.36 (0.34%)
SILK 0.98 Increased By ▲ 0.01 (1.03%)
SSGC 37.10 Increased By ▲ 0.70 (1.92%)
SYM 19.02 Decreased By ▼ -0.02 (-0.11%)
TELE 8.50 Increased By ▲ 0.26 (3.16%)
TPLP 12.15 Increased By ▲ 0.37 (3.14%)
TRG 66.30 Increased By ▲ 1.42 (2.19%)
WAVESAPP 11.84 Increased By ▲ 0.21 (1.81%)
WTL 1.69 Increased By ▲ 0.01 (0.6%)
YOUW 3.97 Increased By ▲ 0.12 (3.12%)
BR100 11,856 Increased By 87.9 (0.75%)
BR30 35,340 Increased By 376.5 (1.08%)
KSE100 112,511 Increased By 1023.5 (0.92%)
KSE30 35,293 Increased By 358.9 (1.03%)

HYDERABAD: As Hyderabad received the first torrential downpour of the ongoing monsoon season starting on Saturday night, a widespread power breakdown followed the rain.

The heavy downpour started around 10.20 pm and the power outages immediately followed. The Pakistan Meteorological Department and the district administration are yet to share the official rain readings.

The spokesman of Hyderabad Electric Supply Company (HESCO) Sadiq Kubar informed on Sunday morning that out of 624 feeders of 11 KV in its jurisdiction, some 214 feeders had tripped. “The causes were technical faults and safety reasons,” he claimed. According to him, 109 feeders tripped in Nawabshah circle, 49 in Larr and 38 in Mirpurkhas. He maintained that Chief Executive Officer of HESCO Roshan Otho was himself monitoring the situation, adding that all measures were being taken to restore the electric supply.

The power supply could not be restored in many parts of Hyderabad by Sunday morning. Meanwhile, Mayor Hyderabad Kashif Ali Shoro and Deputy Commissioner Zainul Abedin Memon visited several drainage pumping stations to check that rain water was being speedily drained. They also visited low lying localities in the city.

Comments

Comments are closed.