AIRLINK 207.00 Increased By ▲ 6.71 (3.35%)
BOP 10.29 Decreased By ▼ -0.20 (-1.91%)
CNERGY 7.17 Decreased By ▼ -0.04 (-0.55%)
FCCL 34.73 Decreased By ▼ -0.21 (-0.6%)
FFL 17.10 Decreased By ▼ -0.32 (-1.84%)
FLYNG 24.97 Increased By ▲ 0.12 (0.48%)
HUBC 131.50 Increased By ▲ 3.69 (2.89%)
HUMNL 14.10 Increased By ▲ 0.29 (2.1%)
KEL 4.95 Decreased By ▼ -0.05 (-1%)
KOSM 6.88 Decreased By ▼ -0.15 (-2.13%)
MLCF 44.63 Increased By ▲ 0.01 (0.02%)
OGDC 222.99 Increased By ▲ 0.84 (0.38%)
PACE 7.24 Decreased By ▼ -0.18 (-2.43%)
PAEL 42.80 No Change ▼ 0.00 (0%)
PIAHCLA 17.18 Decreased By ▼ -0.21 (-1.21%)
PIBTL 8.47 Decreased By ▼ -0.04 (-0.47%)
POWER 9.10 Decreased By ▼ -0.05 (-0.55%)
PPL 191.49 Decreased By ▼ -1.24 (-0.64%)
PRL 43.75 Increased By ▲ 2.25 (5.42%)
PTC 25.10 Increased By ▲ 0.66 (2.7%)
SEARL 103.50 Increased By ▲ 2.23 (2.2%)
SILK 1.01 Decreased By ▼ -0.04 (-3.81%)
SSGC 43.00 Decreased By ▼ -0.87 (-1.98%)
SYM 18.50 Decreased By ▼ -0.26 (-1.39%)
TELE 9.26 Decreased By ▼ -0.28 (-2.94%)
TPLP 13.28 Increased By ▲ 0.20 (1.53%)
TRG 69.50 Increased By ▲ 3.31 (5%)
WAVESAPP 10.40 Decreased By ▼ -0.13 (-1.23%)
WTL 1.81 Increased By ▲ 0.03 (1.69%)
YOUW 4.00 Decreased By ▼ -0.04 (-0.99%)
BR100 12,093 Increased By 53.7 (0.45%)
BR30 37,024 Increased By 335.5 (0.91%)
KSE100 114,839 Increased By 34.8 (0.03%)
KSE30 36,088 Decreased By -14 (-0.04%)

ISLAMABAD: The Ministry of Planning, Development and Special initiative (PD&SI) is considering not allocating funds in the Public Sector Development Programme (PSDP) for Departmental Development Working Party’s (DDWPs) approved and recommended projects simply because these are poorly designed and implemented.

This was stated by Secretary Planning, Development and Special Imitative during a discussion in a parliamentary panel on allocation of Rs 5.414 billion in PSDP for solar power plant in Sher Ghar Tehsil Layyah. After Senate committee expressed serious concern over not implementing such projects (solar plant) through private sector, Secretary Planning said the ministry has nothing to do with it as it was proposed by the DDWP. He added going forward the plan is in order to discourage DDWP funding would not be allocated for them in the PSDP for the reason because these are poorly-designed and implemented because of conflict of interest. The committee also proposed that DDWP meeting should be co-chaired by the secretary planning and Finance.

Earlier, the meeting was informed that the revised PC-1 for purchase of 4827 acre and 07 Marlas with total cost of Rs 5.413 billion after approval of Ministry of Energy was uploaded on integrated project automated system in April 2024.

Ahsan fears Rs200bn-400bn cut in PSDP outlay

The meeting was further informed that pre-CDWP meeting held on 16.05 2024, the NTDC was directed for rationalization of the cost further. Review meeting held on 24 06 2024 and in compliance to its minutes of meeting, the cost has been rationalized from Rs 6.208 billion to Rs 5.414 billion.

The Private Power Infrastructure Board (PPIB) also submitted preliminary study on the suitability of establishment of Solar PV Project on 12-07-2024 wherein it was concluded that the potential for establishing a photovoltaic plant at the identified site appears promising given the prevailing climatic conditions. Despite challenges posed by high temperature, dust storms and minimal precipitation, the site abundant solar irradiance makes it a favorable location for photovoltaic infrastructure. The combination of ample sunlight exposure and favorable environmental conditions underscore the potential for efficient energy generation and highlights the feasibility of sustainable power production in this area.

The meeting was further told that the report of the PPIB has been e forwarded to Power System Planning Department of the NTDC dated 1st August 2024 for onward submission to concern department.

Copyright Business Recorder, 2024

Comments

Comments are closed.