AIRLINK 157.41 Decreased By ▼ -6.97 (-4.24%)
BOP 10.37 Decreased By ▼ -0.20 (-1.89%)
CNERGY 8.32 Decreased By ▼ -0.08 (-0.95%)
CPHL 92.89 Increased By ▲ 2.93 (3.26%)
FCCL 46.73 Decreased By ▼ -0.21 (-0.45%)
FFL 14.88 Decreased By ▼ -0.36 (-2.36%)
FLYNG 26.98 Increased By ▲ 0.65 (2.47%)
HUBC 134.01 Decreased By ▼ -2.36 (-1.73%)
HUMNL 12.52 Decreased By ▼ -0.49 (-3.77%)
KEL 4.21 Decreased By ▼ -0.07 (-1.64%)
KOSM 5.39 Decreased By ▼ -0.22 (-3.92%)
MLCF 60.88 Increased By ▲ 0.09 (0.15%)
OGDC 208.52 Decreased By ▼ -6.37 (-2.96%)
PACE 5.40 Decreased By ▼ -0.14 (-2.53%)
PAEL 40.78 Decreased By ▼ -1.22 (-2.9%)
PIAHCLA 18.80 Increased By ▲ 1.06 (5.98%)
PIBTL 9.98 Decreased By ▼ -0.25 (-2.44%)
POWER 11.96 Increased By ▲ 0.06 (0.5%)
PPL 168.77 Decreased By ▼ -5.45 (-3.13%)
PRL 35.03 Decreased By ▼ -0.51 (-1.44%)
PTC 22.99 Increased By ▲ 0.05 (0.22%)
SEARL 93.10 Decreased By ▼ -1.94 (-2.04%)
SSGC 35.57 Decreased By ▼ -1.04 (-2.84%)
SYM 13.66 Decreased By ▼ -0.27 (-1.94%)
TELE 6.95 Decreased By ▼ -0.29 (-4.01%)
TPLP 10.00 Decreased By ▼ -0.27 (-2.63%)
TRG 60.67 Decreased By ▼ -0.86 (-1.4%)
WAVESAPP 9.70 Decreased By ▼ -0.62 (-6.01%)
WTL 1.30 Decreased By ▼ -0.02 (-1.52%)
YOUW 3.65 Decreased By ▼ -0.04 (-1.08%)
BR100 12,239 Decreased By -154.2 (-1.24%)
BR30 36,393 Decreased By -714.3 (-1.92%)
KSE100 114,153 Decreased By -1379.3 (-1.19%)
KSE30 35,200 Decreased By -461.3 (-1.29%)

LAHORE: The National Transmission and Despatch Company Limited (NTDC) has successfully added a 250 MVA autotransformer at 500 kV Grid Station Sheikhupura to enhance its power transmission capacity.

The augmentation work of existing 160 MVA, 220/132 kV autotransformer (T-8) with 250 MVA, 220/132 kV autotransformer has been completed by Project Delivery (North) Lahore, the autotransformer successfully energized, today.

A shutdown was approved up to 14-08-2024 for this work, however, NTDC team completed the project 03-days before the scheduled shutdown period by deploying extra resources.

The augmentation of this autotransformer will enhance the loading capacity of 500 kV Grid Station Sheikhupura and provide relief to the areas under Lahore Electric Supply Company (LESCO).

The enhanced capacity of this grid station will ensure smooth power supply, which will benefit the domestic, commercial and industrial consumers.

Copyright Business Recorder, 2024

Comments

Comments are closed.