AIRLINK 201.40 Increased By ▲ 1.11 (0.55%)
BOP 10.48 Decreased By ▼ -0.01 (-0.1%)
CNERGY 7.27 Increased By ▲ 0.06 (0.83%)
FCCL 35.23 Increased By ▲ 0.29 (0.83%)
FFL 17.55 Increased By ▲ 0.13 (0.75%)
FLYNG 25.63 Increased By ▲ 0.78 (3.14%)
HUBC 129.04 Increased By ▲ 1.23 (0.96%)
HUMNL 14.05 Increased By ▲ 0.24 (1.74%)
KEL 4.98 Decreased By ▼ -0.02 (-0.4%)
KOSM 7.13 Increased By ▲ 0.10 (1.42%)
MLCF 45.10 Increased By ▲ 0.48 (1.08%)
OGDC 222.91 Increased By ▲ 0.76 (0.34%)
PACE 7.29 Decreased By ▼ -0.13 (-1.75%)
PAEL 42.99 Increased By ▲ 0.19 (0.44%)
PIAHCLA 17.29 Decreased By ▼ -0.10 (-0.58%)
PIBTL 8.63 Increased By ▲ 0.12 (1.41%)
POWER 9.20 Increased By ▲ 0.05 (0.55%)
PPL 192.80 Increased By ▲ 0.07 (0.04%)
PRL 42.63 Increased By ▲ 1.13 (2.72%)
PTC 25.30 Increased By ▲ 0.86 (3.52%)
SEARL 104.50 Increased By ▲ 3.23 (3.19%)
SILK 1.03 Decreased By ▼ -0.02 (-1.9%)
SSGC 44.01 Increased By ▲ 0.14 (0.32%)
SYM 18.81 Increased By ▲ 0.05 (0.27%)
TELE 9.48 Decreased By ▼ -0.06 (-0.63%)
TPLP 13.10 Increased By ▲ 0.02 (0.15%)
TRG 69.05 Increased By ▲ 2.86 (4.32%)
WAVESAPP 10.60 Increased By ▲ 0.07 (0.66%)
WTL 1.80 Increased By ▲ 0.02 (1.12%)
YOUW 4.07 Increased By ▲ 0.03 (0.74%)
BR100 12,102 Increased By 62 (0.52%)
BR30 37,051 Increased By 362.2 (0.99%)
KSE100 115,392 Increased By 587.5 (0.51%)
KSE30 36,227 Increased By 124.6 (0.35%)

ISLAMABAD: The Capital Development Authority (CDA) has approved a feasibility study to be conducted by WAPDA for the construction of the Shahdara and Chiniot Dams in Islamabad.

During the 11th CDA Board meeting, chaired by CDA Chairman Muhammad Ali Randhawa, several key agenda items were discussed.

The Board gave the green light for pre-feasibility studies on various water supply projects in the capital, also to be conducted by WAPDA.

This includes exploring solutions for water lost due to seepage from Khanpur Dam, with potential plans to lay a pipeline connecting Khanpur Dam to the Sangjani Treatment Plant.

In addition to the water projects, the Board approved hiring a consultant under PPRA Rule 42(F) for the construction of 104 family suites for parliamentarians, replacing the previous consultant for the project.

The CDA also approved terms and conditions for the auction of commercial plots, emphasising an investor-friendly approach in the auction process.

Copyright Business Recorder, 2024

Comments

Comments are closed.