AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

ISLAMABAD: The Government of Pakistan’s state-of-the-art AMI project is steadfastly progressing in the IESCO region, driven by a commitment to bring power sector reforms, innovation, and exceptional customer service.

According to the details, in the initial phase, the installation of Advanced Metering Infrastructure (AMI) meters is rolling out swiftly in the two operation circles of IESCO, namely Rawalpindi City and Rawalpindi Cantt.

As of the latest report, over 110,000 AMI meters have been successfully installed, and it is expected that by 2026, the replacement of all outdated electricity meters in Rawalpindi City, Rawalpindi Cantt Circles, and Taxila, whereas all MDI meters and high license feeders on industrial tariff in the surrounding areas, will be replaced with AMI meters. This upgrade is anticipated to result in the provision of uninterrupted power supply and a substantial reduction in line losses.

The installation of Advanced Metering Infrastructure (AMI) meters will ensure 100 percent accurate and timely meter reading, effective control of electricity theft, precise estimation of electricity demand and supply, real-time monitoring and control of electricity consumption, enhanced revenue recovery and automated registration of meter faults to the SDO office.

IESCO has launched an awareness campaign to educate consumers about AMI meters, providing accurate information and timely responses to their questions through various forums. Furthermore, international experts are also in consultation with IESCO for the installation of AMI meters.

Copyright Business Recorder, 2024

Comments

Comments are closed.