AGL 38.00 No Change ▼ 0.00 (0%)
AIRLINK 213.91 Increased By ▲ 3.53 (1.68%)
BOP 9.42 Decreased By ▼ -0.06 (-0.63%)
CNERGY 6.29 Decreased By ▼ -0.19 (-2.93%)
DCL 8.77 Decreased By ▼ -0.19 (-2.12%)
DFML 42.21 Increased By ▲ 3.84 (10.01%)
DGKC 94.12 Decreased By ▼ -2.80 (-2.89%)
FCCL 35.19 Decreased By ▼ -1.21 (-3.32%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 16.39 Increased By ▲ 1.44 (9.63%)
HUBC 126.90 Decreased By ▼ -3.79 (-2.9%)
HUMNL 13.37 Increased By ▲ 0.08 (0.6%)
KEL 5.31 Decreased By ▼ -0.19 (-3.45%)
KOSM 6.94 Increased By ▲ 0.01 (0.14%)
MLCF 42.98 Decreased By ▼ -1.80 (-4.02%)
NBP 58.85 Decreased By ▼ -0.22 (-0.37%)
OGDC 219.42 Decreased By ▼ -10.71 (-4.65%)
PAEL 39.16 Decreased By ▼ -0.13 (-0.33%)
PIBTL 8.18 Decreased By ▼ -0.13 (-1.56%)
PPL 191.66 Decreased By ▼ -8.69 (-4.34%)
PRL 37.92 Decreased By ▼ -0.96 (-2.47%)
PTC 26.34 Decreased By ▼ -0.54 (-2.01%)
SEARL 104.00 Increased By ▲ 0.37 (0.36%)
TELE 8.39 Decreased By ▼ -0.06 (-0.71%)
TOMCL 34.75 Decreased By ▼ -0.50 (-1.42%)
TPLP 12.88 Decreased By ▼ -0.64 (-4.73%)
TREET 25.34 Increased By ▲ 0.33 (1.32%)
TRG 70.45 Increased By ▲ 6.33 (9.87%)
UNITY 33.39 Decreased By ▼ -1.13 (-3.27%)
WTL 1.72 Decreased By ▼ -0.06 (-3.37%)
BR100 11,881 Decreased By -216 (-1.79%)
BR30 36,807 Decreased By -908.3 (-2.41%)
KSE100 110,423 Decreased By -1991.5 (-1.77%)
KSE30 34,778 Decreased By -730.1 (-2.06%)

LAHORE: Chairman WAPDA Engr. Lt Gen Sajjad Ghani (retd) has said that Dasu Hydropower Project is of immense importance for meeting the energy requirements of the country through indigenous yet clean, green and affordable hydel electricity; therefore, concerted efforts are needed for completion of the project as per the timelines.

He expressed these views during his visit to Dasu Hydropower Project, being constructed by WAPDA on River Indus in Upper Kohistan District of Khyber Pakhtunkhwa. The Chairman had a detailed visit of the various sites, which included left and right abutments of the main dam, under-ground power house and transformers cavern, main crushing and batching plants and re-located Karakoram Highway (KKH-I), and reviewed construction activities there.

The GM/PD Dasu Hydropower Project, the Consultants and the Contractors briefed the Chairman about the site-wise targets and achievements on the Project. It was briefed that construction activities on 15 key work fronts are progressing ahead uninterruptedly and at a good pace. After construction of upstream starter dam up to 798 feet above mean sea level, the diversion system this season successfully passed the recent floods through the two diversion tunnels and a bypass tunnel. Excavation and slope stabilization continued on left and right abutments of the main dam, power house and transformers cavern. While, all seven tunnels of KKH-I have achieved their breakthrough mark. While, land acquisition for the Project is also complete.

Later, the Chairman also participated in a Jirga with elders and civil administration of the three districts namely Upper Kohistan, Lower Kohistan and Kolai Pallas. The matters about payments under Enhanced Self-Managed Relocation (ESMR) Package and implementation of Local Area Development Schemes (LADS) were discussed in detail. Reiterating his resolve, the Chairman said that WAPDA is committed to bringing positive change in the life of the people residing in the Project area, and with this in view; WAPDA is spending Rs17.34 billion on the schemes of resettlement, environmental management and social development in the area. He directed the Project Management to promptly address grievances of the locals about ESMR Package and LADS.

Copyright Business Recorder, 2024

Comments

Comments are closed.