AGL 38.48 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 203.02 Decreased By ▼ -4.75 (-2.29%)
BOP 10.17 Increased By ▲ 0.11 (1.09%)
CNERGY 6.54 Decreased By ▼ -0.54 (-7.63%)
DCL 9.58 Decreased By ▼ -0.41 (-4.1%)
DFML 40.02 Decreased By ▼ -1.12 (-2.72%)
DGKC 98.08 Decreased By ▼ -5.38 (-5.2%)
FCCL 34.96 Decreased By ▼ -1.39 (-3.82%)
FFBL 86.43 Decreased By ▼ -5.16 (-5.63%)
FFL 13.90 Decreased By ▼ -0.70 (-4.79%)
HUBC 131.57 Decreased By ▼ -7.86 (-5.64%)
HUMNL 14.02 Decreased By ▼ -0.08 (-0.57%)
KEL 5.61 Decreased By ▼ -0.36 (-6.03%)
KOSM 7.27 Decreased By ▼ -0.59 (-7.51%)
MLCF 45.59 Decreased By ▼ -1.69 (-3.57%)
NBP 66.38 Decreased By ▼ -7.38 (-10.01%)
OGDC 220.76 Decreased By ▼ -1.90 (-0.85%)
PAEL 38.48 Increased By ▲ 0.37 (0.97%)
PIBTL 8.91 Decreased By ▼ -0.36 (-3.88%)
PPL 197.88 Decreased By ▼ -7.97 (-3.87%)
PRL 39.03 Decreased By ▼ -0.82 (-2.06%)
PTC 25.47 Decreased By ▼ -1.15 (-4.32%)
SEARL 103.05 Decreased By ▼ -7.19 (-6.52%)
TELE 9.02 Decreased By ▼ -0.21 (-2.28%)
TOMCL 36.41 Decreased By ▼ -1.80 (-4.71%)
TPLP 13.75 Decreased By ▼ -0.02 (-0.15%)
TREET 25.12 Decreased By ▼ -1.33 (-5.03%)
TRG 58.04 Decreased By ▼ -2.50 (-4.13%)
UNITY 33.67 Decreased By ▼ -0.47 (-1.38%)
WTL 1.71 Decreased By ▼ -0.17 (-9.04%)
BR100 11,890 Decreased By -408.8 (-3.32%)
BR30 37,357 Decreased By -1520.9 (-3.91%)
KSE100 111,070 Decreased By -3790.4 (-3.3%)
KSE30 34,909 Decreased By -1287 (-3.56%)

LAHORE: Lahore Electric Supply Company (Lesco) is all set to repatriate captive power plants (CPPs) to the national grid ahead, a move that has sparked widespread outrage and concern among manufacturers.

While terming it an existential threat, the manufacturers have disputed the government’s classification of 11Kv feeders as "independent," arguing they are "dedicated feeders" due to shared infrastructure and structural limitations. They have further claimed that existing sanctioned loads meet demands, rendering repatriation unnecessary.

It may be noted that the Lesco has designed the repatriation plan, citing reduced circular debt and increased transparency. As per plan, gas facilities would be withdrawn from the CPPs but the manufacturer believes that it would increase production costs, compromise steam generation, and force reliance on expensive diesel generation.

Further, they said, this proposal would devastate their manufacturing units, making them uncompetitive globally. Therefore, they have urged the government to reconsider keeping in view the phenomenon of job losses, negative economic impact and a compromised global competitiveness of the industry.

They have stressed the competent authorities to arrive at a well informed decision in the best interest of industries with cogeneration captive power/captive power, as withdrawal of gas facility will have catastrophic consequences on these industries.

Further, they said, grid supply is substantially more expensive than gas which would escalate production costs.

Meanwhile, continuity of the grid supply is another cause of concern for the industrial units, which is unreliable as overhead grid supply systems are exposed to numerous kinds of hazards in addition to faults and shutdowns for maintenance of 11Kv feeders and grid station.

During grid supply interruptions, said manufacturers, they would be left with no other option but to switch to diesel generation, which would cost them Rs100/kWh. Hence, this would surge their production costs and the inevitable power outages would further wreak havoc with the fate of cogeneration captive/captive power industries. Also, higher costs will render their uncompetitive in the international market and power failures would jeopardize export orders and foreign exchange earnings.

Copyright Business Recorder, 2024

Comments

Comments are closed.