AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 9,963 Increased By 79.1 (0.8%)
BR30 30,924 Increased By 323.9 (1.06%)
KSE100 93,991 Increased By 635.2 (0.68%)
KSE30 29,112 Increased By 180.7 (0.62%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

200 characters