AGL 40.00 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.00 Decreased By ▼ -0.99 (-0.77%)
BOP 6.68 Increased By ▲ 0.08 (1.21%)
CNERGY 4.49 Decreased By ▼ -0.11 (-2.39%)
DCL 8.60 Increased By ▲ 0.12 (1.42%)
DFML 41.30 Decreased By ▼ -0.18 (-0.43%)
DGKC 86.71 Increased By ▲ 0.13 (0.15%)
FCCL 32.16 Increased By ▲ 0.02 (0.06%)
FFBL 64.70 Decreased By ▼ -0.72 (-1.1%)
FFL 10.29 Increased By ▲ 0.04 (0.39%)
HUBC 109.51 Decreased By ▼ -0.98 (-0.89%)
HUMNL 14.90 Increased By ▲ 0.15 (1.02%)
KEL 5.05 Decreased By ▼ -0.08 (-1.56%)
KOSM 7.40 Increased By ▲ 0.28 (3.93%)
MLCF 41.39 Decreased By ▼ -0.26 (-0.62%)
NBP 60.60 Increased By ▲ 0.51 (0.85%)
OGDC 190.00 Decreased By ▼ -4.69 (-2.41%)
PAEL 27.81 Decreased By ▼ -0.14 (-0.5%)
PIBTL 7.75 Decreased By ▼ -0.25 (-3.13%)
PPL 149.75 Decreased By ▼ -1.42 (-0.94%)
PRL 26.73 Decreased By ▼ -0.15 (-0.56%)
PTC 16.18 Increased By ▲ 0.18 (1.13%)
SEARL 86.02 Increased By ▲ 7.82 (10%)
TELE 7.72 Increased By ▲ 0.33 (4.47%)
TOMCL 35.58 Decreased By ▼ -0.09 (-0.25%)
TPLP 8.14 Increased By ▲ 0.23 (2.91%)
TREET 16.51 Increased By ▲ 0.62 (3.9%)
TRG 53.35 Increased By ▲ 0.59 (1.12%)
UNITY 26.28 Decreased By ▼ -0.27 (-1.02%)
WTL 1.26 Decreased By ▼ -0.01 (-0.79%)
BR100 9,889 Decreased By -31.1 (-0.31%)
BR30 30,611 Decreased By -140.9 (-0.46%)
KSE100 93,355 Increased By 130.9 (0.14%)
KSE30 28,931 Increased By 46 (0.16%)

ISLAMABAD: The installation process of Advanced Metering Infrastructure (AMI) meters equipped with modern technology and modern requirements is going on rapidly in two operation circles of IESCO Rawalpindi City and Rawalpindi Cantt.

Project Director AMI Mohsin Raza Gilani while giving details said that in the initial phase, advanced metering infrastructure (AMI) meters are being installed in the Rawalpindi City and Rawalpindi cantt circles and so far 275000 AMI meters have been replaced with old electricity meters and hopefully by the end of the year 2026, 1.2 million old meters of Rawalpindi City and Rawalpindi cant circles will be replaced with AMI meters.

Mohsin Raza Gilani said that in the arrears of Korang, Swan, DHA 2, Chaklala, Chandi Chowk, F Block, Saham, Khayaban Sir Syed, Gangal, Fiaiza, Murree Road, PWD, National Police Foundation, Media Town areas AMI meters have been installed and it is hoped that the target of installation of 1.2 million AMI meters will be achieved within the stipulated period. He said the advance metering Infrastructure AMI meters will ensure Automatic meter reading, control of electricity theft, elimination of system overloading, reduction in burn incidents of transformers and meters and will also ensure timely registration and rectification of valuable IESCO customers’ complaints.

Copyright Business Recorder, 2024

Comments

200 characters