AGL 39.58 Decreased By ▼ -0.42 (-1.05%)
AIRLINK 131.22 Increased By ▲ 2.16 (1.67%)
BOP 6.81 Increased By ▲ 0.06 (0.89%)
CNERGY 4.71 Increased By ▲ 0.22 (4.9%)
DCL 8.44 Decreased By ▼ -0.11 (-1.29%)
DFML 41.47 Increased By ▲ 0.65 (1.59%)
DGKC 82.09 Increased By ▲ 1.13 (1.4%)
FCCL 33.10 Increased By ▲ 0.33 (1.01%)
FFBL 72.87 Decreased By ▼ -1.56 (-2.1%)
FFL 12.26 Increased By ▲ 0.52 (4.43%)
HUBC 110.74 Increased By ▲ 1.16 (1.06%)
HUMNL 14.51 Increased By ▲ 0.76 (5.53%)
KEL 5.19 Decreased By ▼ -0.12 (-2.26%)
KOSM 7.61 Decreased By ▼ -0.11 (-1.42%)
MLCF 38.90 Increased By ▲ 0.30 (0.78%)
NBP 64.01 Increased By ▲ 0.50 (0.79%)
OGDC 192.82 Decreased By ▼ -1.87 (-0.96%)
PAEL 25.68 Decreased By ▼ -0.03 (-0.12%)
PIBTL 7.34 Decreased By ▼ -0.05 (-0.68%)
PPL 154.07 Decreased By ▼ -1.38 (-0.89%)
PRL 25.83 Increased By ▲ 0.04 (0.16%)
PTC 17.81 Increased By ▲ 0.31 (1.77%)
SEARL 82.30 Increased By ▲ 3.65 (4.64%)
TELE 7.76 Decreased By ▼ -0.10 (-1.27%)
TOMCL 33.46 Decreased By ▼ -0.27 (-0.8%)
TPLP 8.49 Increased By ▲ 0.09 (1.07%)
TREET 16.62 Increased By ▲ 0.35 (2.15%)
TRG 57.40 Decreased By ▼ -0.82 (-1.41%)
UNITY 27.51 Increased By ▲ 0.02 (0.07%)
WTL 1.37 Decreased By ▼ -0.02 (-1.44%)
BR100 10,504 Increased By 59.3 (0.57%)
BR30 31,226 Increased By 36.9 (0.12%)
KSE100 98,080 Increased By 281.6 (0.29%)
KSE30 30,559 Increased By 78 (0.26%)

Traffic Engineering Transport Planning Agency (TEPA) has completed the construction of a hockey stadium of international standard in Johar Town, Lahore, at a cost of Rs 139 million. According to a Lahore Development Authority (LDA)'s spokesperson here on Wednesday, the stadium has been built on a land measuring 24 kanals.
All the facilities and infrastructure, required for holding international matches, have been provided at this place, including green synthetic turf and flood lights. A total of 1,500 chairs have been put up in the stadium for the spectators besides arranging parking facility for 132 cars.
Four flood light poles fixed with 64 lights of 2000 watts have been installed in the stadium besides setting up a pavilion spreading over 3,900 square feet. Moreover, two changing rooms, one meeting room, one conference hall, central lobby, a kitchen, a store, podium and toilets have also been constructed as part of this project.

Copyright Business Recorder, 2012

Comments

Comments are closed.