AIRLINK 166.94 Decreased By ▼ -1.57 (-0.93%)
BOP 9.71 Decreased By ▼ -0.08 (-0.82%)
CNERGY 7.82 Decreased By ▼ -0.17 (-2.13%)
CPHL 88.87 Increased By ▲ 0.90 (1.02%)
FCCL 44.58 Increased By ▲ 0.65 (1.48%)
FFL 15.41 Decreased By ▼ -0.11 (-0.71%)
FLYNG 28.62 Increased By ▲ 0.68 (2.43%)
HUBC 139.39 Increased By ▲ 1.42 (1.03%)
HUMNL 12.07 Decreased By ▼ -0.30 (-2.43%)
KEL 4.20 Decreased By ▼ -0.04 (-0.94%)
KOSM 5.48 Decreased By ▼ -0.08 (-1.44%)
MLCF 67.46 Increased By ▲ 2.67 (4.12%)
OGDC 212.37 Increased By ▲ 0.68 (0.32%)
PACE 5.53 Decreased By ▼ -0.20 (-3.49%)
PAEL 44.31 Decreased By ▼ -0.71 (-1.58%)
PIAHCLA 16.80 Decreased By ▼ -0.29 (-1.7%)
PIBTL 9.37 Increased By ▲ 0.14 (1.52%)
POWER 14.28 Decreased By ▼ -0.17 (-1.18%)
PPL 164.05 Decreased By ▼ -2.35 (-1.41%)
PRL 29.41 Decreased By ▼ -1.24 (-4.05%)
PTC 21.30 Increased By ▲ 0.10 (0.47%)
SEARL 88.99 Decreased By ▼ -1.48 (-1.64%)
SSGC 40.49 Decreased By ▼ -0.56 (-1.36%)
SYM 14.64 Increased By ▲ 0.16 (1.1%)
TELE 7.17 Decreased By ▼ -0.22 (-2.98%)
TPLP 9.15 Decreased By ▼ -0.22 (-2.35%)
TRG 64.27 Decreased By ▼ -0.73 (-1.12%)
WAVESAPP 9.42 Decreased By ▼ -0.09 (-0.95%)
WTL 1.29 Decreased By ▼ -0.02 (-1.53%)
YOUW 3.65 Decreased By ▼ -0.07 (-1.88%)
AIRLINK 166.94 Decreased By ▼ -1.57 (-0.93%)
BOP 9.71 Decreased By ▼ -0.08 (-0.82%)
CNERGY 7.82 Decreased By ▼ -0.17 (-2.13%)
CPHL 88.87 Increased By ▲ 0.90 (1.02%)
FCCL 44.58 Increased By ▲ 0.65 (1.48%)
FFL 15.41 Decreased By ▼ -0.11 (-0.71%)
FLYNG 28.62 Increased By ▲ 0.68 (2.43%)
HUBC 139.39 Increased By ▲ 1.42 (1.03%)
HUMNL 12.07 Decreased By ▼ -0.30 (-2.43%)
KEL 4.20 Decreased By ▼ -0.04 (-0.94%)
KOSM 5.48 Decreased By ▼ -0.08 (-1.44%)
MLCF 67.46 Increased By ▲ 2.67 (4.12%)
OGDC 212.37 Increased By ▲ 0.68 (0.32%)
PACE 5.53 Decreased By ▼ -0.20 (-3.49%)
PAEL 44.31 Decreased By ▼ -0.71 (-1.58%)
PIAHCLA 16.80 Decreased By ▼ -0.29 (-1.7%)
PIBTL 9.37 Increased By ▲ 0.14 (1.52%)
POWER 14.28 Decreased By ▼ -0.17 (-1.18%)
PPL 164.05 Decreased By ▼ -2.35 (-1.41%)
PRL 29.41 Decreased By ▼ -1.24 (-4.05%)
PTC 21.30 Increased By ▲ 0.10 (0.47%)
SEARL 88.99 Decreased By ▼ -1.48 (-1.64%)
SSGC 40.49 Decreased By ▼ -0.56 (-1.36%)
SYM 14.64 Increased By ▲ 0.16 (1.1%)
TELE 7.17 Decreased By ▼ -0.22 (-2.98%)
TPLP 9.15 Decreased By ▼ -0.22 (-2.35%)
TRG 64.27 Decreased By ▼ -0.73 (-1.12%)
WAVESAPP 9.42 Decreased By ▼ -0.09 (-0.95%)
WTL 1.29 Decreased By ▼ -0.02 (-1.53%)
YOUW 3.65 Decreased By ▼ -0.07 (-1.88%)
BR100 12,327 Increased By 71.3 (0.58%)
BR30 36,803 Increased By 80.1 (0.22%)
KSE100 115,469 Increased By 449.5 (0.39%)
KSE30 35,563 Increased By 234.3 (0.66%)
Markets

PM Shehbaz calls for immediate shutdown of inefficient power plants, pushes for renewables

  • Statement from PM's Office says premier wants reforms in power sector expedited
Published December 13, 2024

Prime Minister Shehbaz Sharif has called for an immediate shutdown of inefficient power plants while emphasising the need for a further reduction in electricity tariffs for consumers, according to a statement issued by the premier’s office.

Presiding over a review meeting on the power generation projects and the power sector in Pakistan, PM Shehbaz issued directives to ensure all measures related to power sector reforms are completed within the stipulated timeline.

According to a statement released by the PM’s Office on Friday, during the meeting, the participants were briefed on proposed new power projects, progress on ongoing projects, and the reforms underway in the electricity sector.

Outsandings against provincial depts/entities: Power minister seeks CMs’ intervention for recovery

The prime minister was given an update on the progress regarding the decommissioning of inefficient power plants.

“These outdated power plants should be shut down immediately,” he said.

“The closure of such plants will not only save valuable foreign exchange spent on fuel imports but also reduce electricity costs for consumers,” he emphasised.

PM Shehbaz directed authorities to take immediate action against officials deliberately obstructing power sector reforms. “The implementation of ongoing reforms in the power transmission system should be expedited,” he said.

The meeting also reviewed the current demand and capacity of electricity and progress in reforms within the transmission system.

Discos’ sell-off: Power Division fails to satisfy Senate panel

“Only low-cost electricity projects should be prioritized in the future,” stated PM Shehbaz, adding that local resources should be given priority for power generation projects.

The premier was also briefed on the progress of ongoing hydropower projects across the country. “Hydropower projects provide low-cost, eco-friendly electricity to consumers,” he said.

KE FCA for October: Nepra to approve Rs0.27/unit negative adjustment

Talking about renewable energy, the prime minister directed that the current electricity capacity should also be converted to solar energy. “Solar energy, an eco-friendly and low-cost source of electricity, is being utilized worldwide. Pakistan is fortunate to have vast potential for solar energy,” he said.

Federal Ministers Ahad Khan Cheema, Sardar Awais Khan Leghari, Dr Musadik Malik, Minister of State Ali Pervaiz Malik, and other senior officials participated in the meeting.

Comments

200 characters