AGL 38.20 Increased By ▲ 0.05 (0.13%)
AIRLINK 129.30 Increased By ▲ 4.23 (3.38%)
BOP 7.85 Increased By ▲ 1.00 (14.6%)
CNERGY 4.66 Increased By ▲ 0.21 (4.72%)
DCL 8.35 Increased By ▲ 0.44 (5.56%)
DFML 38.86 Increased By ▲ 1.52 (4.07%)
DGKC 82.20 Increased By ▲ 4.43 (5.7%)
FCCL 33.64 Increased By ▲ 3.06 (10.01%)
FFBL 75.75 Increased By ▲ 6.89 (10.01%)
FFL 12.83 Increased By ▲ 0.97 (8.18%)
HUBC 110.72 Increased By ▲ 6.22 (5.95%)
HUMNL 14.03 Increased By ▲ 0.54 (4%)
KEL 5.22 Increased By ▲ 0.57 (12.26%)
KOSM 7.69 Increased By ▲ 0.52 (7.25%)
MLCF 40.08 Increased By ▲ 3.64 (9.99%)
NBP 72.51 Increased By ▲ 6.59 (10%)
OGDC 189.18 Increased By ▲ 9.65 (5.38%)
PAEL 25.74 Increased By ▲ 1.31 (5.36%)
PIBTL 7.38 Increased By ▲ 0.23 (3.22%)
PPL 153.45 Increased By ▲ 9.75 (6.78%)
PRL 25.52 Increased By ▲ 1.20 (4.93%)
PTC 17.92 Increased By ▲ 1.52 (9.27%)
SEARL 82.50 Increased By ▲ 3.93 (5%)
TELE 7.63 Increased By ▲ 0.41 (5.68%)
TOMCL 32.50 Increased By ▲ 0.53 (1.66%)
TPLP 8.48 Increased By ▲ 0.35 (4.31%)
TREET 16.74 Increased By ▲ 0.61 (3.78%)
TRG 56.01 Increased By ▲ 1.35 (2.47%)
UNITY 28.85 Increased By ▲ 1.35 (4.91%)
WTL 1.34 Increased By ▲ 0.05 (3.88%)
BR100 10,659 Increased By 569.2 (5.64%)
BR30 31,331 Increased By 1822.5 (6.18%)
KSE100 99,269 Increased By 4695.1 (4.96%)
KSE30 31,032 Increased By 1587.6 (5.39%)

The gas pipeline feeding Yemen's only liquefied natural gas (LNG) export terminal was blown up again early on Sunday, the company operating the pipeline said. "Yemen LNG confirms the sabotage of the 38 inch gas pipeline that links the block 18 to the Balhaf terminal on the Gulf of Aden," the company, run by France's Total, said in a statement. "The sabotage occurred at 0035 hrs on December 16, 2012 at 173 km north of Balhaf."
The pipeline was last blown up about 295 km north of gas liquefaction plant on October 30. It was repaired in November and loaded a few cargoes of super cooled gas in early December.
Yemen's oil and gas pipelines have been sabotaged repeatedly since anti-government protests last year created a power vacuum which armed groups exploited, causing fuel shortages and slashing export earnings in the impoverished country.
The 320-km (200-mile) pipeline supplying the $4.5-billion plant has been attacked several times by suspected al Qaeda-linked gunmen after military strikes on Islamist militants. The Balhaf facility, which opened in 2009, has the capacity to supply up to 6.7 million tonnes and delivers LNG, gas-cooled to liquid for export by ship, under long-term contracts to GDF Suez, Total and Korea Gas Corp.

Copyright Reuters, 2012

Comments

Comments are closed.