AGL 38.16 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 134.19 Increased By ▲ 5.22 (4.05%)
BOP 8.85 Increased By ▲ 1.00 (12.74%)
CNERGY 4.69 Increased By ▲ 0.03 (0.64%)
DCL 8.67 Increased By ▲ 0.35 (4.21%)
DFML 39.78 Increased By ▲ 0.84 (2.16%)
DGKC 85.15 Increased By ▲ 3.21 (3.92%)
FCCL 34.90 Increased By ▲ 1.48 (4.43%)
FFBL 75.60 Decreased By ▼ -0.11 (-0.15%)
FFL 12.74 Decreased By ▼ -0.08 (-0.62%)
HUBC 109.45 Decreased By ▼ -0.91 (-0.82%)
HUMNL 14.10 Increased By ▲ 0.09 (0.64%)
KEL 5.40 Increased By ▲ 0.25 (4.85%)
KOSM 7.75 Increased By ▲ 0.08 (1.04%)
MLCF 41.37 Increased By ▲ 1.57 (3.94%)
NBP 69.70 Decreased By ▼ -2.62 (-3.62%)
OGDC 193.62 Increased By ▲ 5.33 (2.83%)
PAEL 26.21 Increased By ▲ 0.58 (2.26%)
PIBTL 7.42 Increased By ▲ 0.05 (0.68%)
PPL 163.85 Increased By ▲ 11.18 (7.32%)
PRL 26.36 Increased By ▲ 0.97 (3.82%)
PTC 19.47 Increased By ▲ 1.77 (10%)
SEARL 84.40 Increased By ▲ 1.98 (2.4%)
TELE 7.99 Increased By ▲ 0.40 (5.27%)
TOMCL 34.05 Increased By ▲ 1.48 (4.54%)
TPLP 8.72 Increased By ▲ 0.30 (3.56%)
TREET 17.18 Increased By ▲ 0.40 (2.38%)
TRG 61.00 Increased By ▲ 4.96 (8.85%)
UNITY 28.96 Increased By ▲ 0.18 (0.63%)
WTL 1.37 Increased By ▲ 0.02 (1.48%)
BR100 10,786 Increased By 127.6 (1.2%)
BR30 32,266 Increased By 934.6 (2.98%)
KSE100 100,083 Increased By 813.5 (0.82%)
KSE30 31,193 Increased By 160.9 (0.52%)

Khyber Pakhtunkhwa Caretaker Minister for LG&RDD, Abdur Rauf Khattak was given a detailed presentation regarding the Municipal Services Programme(MSP), preparation of Peshawar Master Plan etc. Under this programme, the MCP will be provided solid waste machinery for the whole corporation areas, including mechanical sweeper, compactors, mini-dumpers, sucking machine, jetting machine, excavators, landfill site machinery, containers and manual sweepers.
Under the water supply sector, the total number of 279 tube wells will be rehabilitated according to the demand of the community and all leakages, rusted, unhygienic pipes of distribution system will be replaced. Similarly, in sanitation sector, the whole drain system of the MCP area will be redesigned and rehabilitated. In sewerage and drainage the existing system will be rehabilitated including the waste water treatment plants.
The five-year, $84 million Municipal Services Programme (MSP) will improve the capacity of the KP government to manage key municipal services, especially water and sanitation systems. In its first phase, the programme aims to improve water supply; clean primary and secondary drains; rehabilitate drains and waste water treatment plants at Shahi Katta and Ring Road and; procure solid waste management machinery and vehicles.

Copyright Business Recorder, 2013

Comments

Comments are closed.