AGL 40.40 Increased By ▲ 0.20 (0.5%)
AIRLINK 129.25 Increased By ▲ 0.14 (0.11%)
BOP 6.81 Increased By ▲ 0.21 (3.18%)
CNERGY 4.13 Increased By ▲ 0.10 (2.48%)
DCL 8.73 Increased By ▲ 0.28 (3.31%)
DFML 41.40 Increased By ▲ 0.15 (0.36%)
DGKC 87.75 Increased By ▲ 0.75 (0.86%)
FCCL 33.85 Increased By ▲ 0.50 (1.5%)
FFBL 66.40 Increased By ▲ 0.50 (0.76%)
FFL 10.69 Increased By ▲ 0.15 (1.42%)
HUBC 113.51 Increased By ▲ 2.81 (2.54%)
HUMNL 15.65 Increased By ▲ 0.42 (2.76%)
KEL 4.87 Increased By ▲ 0.09 (1.88%)
KOSM 7.62 Decreased By ▼ -0.21 (-2.68%)
MLCF 43.10 Increased By ▲ 1.20 (2.86%)
NBP 61.50 Increased By ▲ 1.00 (1.65%)
OGDC 192.20 Increased By ▲ 9.40 (5.14%)
PAEL 27.05 Increased By ▲ 1.69 (6.66%)
PIBTL 7.26 Increased By ▲ 1.00 (15.97%)
PPL 150.50 Increased By ▲ 2.69 (1.82%)
PRL 24.96 Increased By ▲ 0.40 (1.63%)
PTC 16.25 Increased By ▲ 0.01 (0.06%)
SEARL 71.30 Increased By ▲ 0.80 (1.13%)
TELE 7.25 Decreased By ▼ -0.05 (-0.68%)
TOMCL 36.29 Decreased By ▼ -0.01 (-0.03%)
TPLP 8.05 Increased By ▲ 0.20 (2.55%)
TREET 16.30 Increased By ▲ 1.00 (6.54%)
TRG 51.56 Decreased By ▼ -0.14 (-0.27%)
UNITY 27.35 No Change ▼ 0.00 (0%)
WTL 1.27 Increased By ▲ 0.04 (3.25%)
BR100 9,957 Increased By 115.5 (1.17%)
BR30 30,770 Increased By 733.6 (2.44%)
KSE100 93,292 Increased By 771.2 (0.83%)
KSE30 29,017 Increased By 230.5 (0.8%)

Khyber Pakhtunkhwa Caretaker Minister for LG&RDD, Abdur Rauf Khattak was given a detailed presentation regarding the Municipal Services Programme(MSP), preparation of Peshawar Master Plan etc. Under this programme, the MCP will be provided solid waste machinery for the whole corporation areas, including mechanical sweeper, compactors, mini-dumpers, sucking machine, jetting machine, excavators, landfill site machinery, containers and manual sweepers.
Under the water supply sector, the total number of 279 tube wells will be rehabilitated according to the demand of the community and all leakages, rusted, unhygienic pipes of distribution system will be replaced. Similarly, in sanitation sector, the whole drain system of the MCP area will be redesigned and rehabilitated. In sewerage and drainage the existing system will be rehabilitated including the waste water treatment plants.
The five-year, $84 million Municipal Services Programme (MSP) will improve the capacity of the KP government to manage key municipal services, especially water and sanitation systems. In its first phase, the programme aims to improve water supply; clean primary and secondary drains; rehabilitate drains and waste water treatment plants at Shahi Katta and Ring Road and; procure solid waste management machinery and vehicles.

Copyright Business Recorder, 2013

Comments

Comments are closed.