AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

During the grand recovery operation against defaulting builders Karachi Water & Sewerage Board Recovery team disconnecting water and sewerage connections confiscated motors of 4 plazas. These plazas are defaulted of more than 7 millions rupees collectively. KW&SB disconnected the line and confiscate motors despite retaliation from miscreants at one of the plazas.
KW&SB has been contacting builders and motivating them to acquire NOC and approval of their water and sewerage connections and payment of their outstanding dues. However, builders have been ignoring KW&SB attempts causing millions of rupees in revenue. Grand recovery operation is targeted at builders and projects with illegal connections and defaulters.
During the operation, 2 inch diametre connection to Burj-ul-Harmain NC-21 Sector 44 Scheme 33 defaulter of 761 thousand, 2 inch diameter connection to Shaiz Residency FL-14 Block 3-A Gulshan-e-Iqbal defaulter of 4.87 million, 1 inch diameter connection to Al-Minal Tower-1 Plot S-B 8, Block 3-A Gulistan-e-Jauhar defaulter of 222 thousand, and Al-Minal Tower-2 Plot S-B 10, Block 3-A Gulistan-e-Jauhar defaulter of 283 thousand were disconnected and motors were confiscated.
KW&SB team was harassed during operation at Al-Minal Tower but KW&SB team despite miscreants' retaliation disconnected the lines. Builders of these projects have been provided with the chance to regularise their connections and pay KW&SB bills to continue using KW&SB facilities.
In this regard, M.D KW&SB has requested citizens that before booking flat, bungalow or shop in residential and commercial projects they should confirm that the builder has acquired NOC and approval of connections from KW&SB to avoid any troubles later. He requested that the citizens must cooperate with KW&SB since it is a public service institution providing water supply and sewerage facilities to the citizens of Karachi therefore citizens and builders must pay their outstanding bills to help stabilise KW&SB.-PR

Copyright Business Recorder, 2013

Comments

Comments are closed.