AIRLINK 180.99 Decreased By ▼ -0.40 (-0.22%)
BOP 11.38 Increased By ▲ 0.21 (1.88%)
CNERGY 8.53 Decreased By ▼ -0.01 (-0.12%)
CPHL 95.29 Increased By ▲ 1.03 (1.09%)
FCCL 46.60 Increased By ▲ 0.42 (0.91%)
FFL 16.25 Increased By ▲ 0.59 (3.77%)
FLYNG 28.72 Increased By ▲ 0.54 (1.92%)
HUBC 144.89 Increased By ▲ 2.12 (1.48%)
HUMNL 13.10 Decreased By ▼ -0.14 (-1.06%)
KEL 4.49 Decreased By ▼ -0.04 (-0.88%)
KOSM 5.68 Decreased By ▼ -0.11 (-1.9%)
MLCF 69.30 Increased By ▲ 3.79 (5.79%)
OGDC 211.85 Decreased By ▼ -1.03 (-0.48%)
PACE 6.01 Decreased By ▼ -0.04 (-0.66%)
PAEL 47.52 Increased By ▲ 0.92 (1.97%)
PIAHCLA 18.02 Decreased By ▼ -0.15 (-0.83%)
PIBTL 10.58 Decreased By ▼ -0.03 (-0.28%)
POWER 13.54 Increased By ▲ 1.23 (9.99%)
PPL 170.60 Decreased By ▼ -0.30 (-0.18%)
PRL 34.61 Increased By ▲ 0.34 (0.99%)
PTC 22.62 Decreased By ▼ -0.24 (-1.05%)
SEARL 96.00 Increased By ▲ 1.05 (1.11%)
SSGC 43.25 Increased By ▲ 0.78 (1.84%)
SYM 14.23 Increased By ▲ 0.04 (0.28%)
TELE 7.26 Increased By ▲ 0.05 (0.69%)
TPLP 9.90 Decreased By ▼ -0.01 (-0.1%)
TRG 65.69 Increased By ▲ 0.14 (0.21%)
WAVESAPP 9.80 Decreased By ▼ -0.05 (-0.51%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
YOUW 3.78 Increased By ▲ 0.02 (0.53%)
AIRLINK 180.99 Decreased By ▼ -0.40 (-0.22%)
BOP 11.38 Increased By ▲ 0.21 (1.88%)
CNERGY 8.53 Decreased By ▼ -0.01 (-0.12%)
CPHL 95.29 Increased By ▲ 1.03 (1.09%)
FCCL 46.60 Increased By ▲ 0.42 (0.91%)
FFL 16.25 Increased By ▲ 0.59 (3.77%)
FLYNG 28.72 Increased By ▲ 0.54 (1.92%)
HUBC 144.89 Increased By ▲ 2.12 (1.48%)
HUMNL 13.10 Decreased By ▼ -0.14 (-1.06%)
KEL 4.49 Decreased By ▼ -0.04 (-0.88%)
KOSM 5.68 Decreased By ▼ -0.11 (-1.9%)
MLCF 69.30 Increased By ▲ 3.79 (5.79%)
OGDC 211.85 Decreased By ▼ -1.03 (-0.48%)
PACE 6.01 Decreased By ▼ -0.04 (-0.66%)
PAEL 47.52 Increased By ▲ 0.92 (1.97%)
PIAHCLA 18.02 Decreased By ▼ -0.15 (-0.83%)
PIBTL 10.58 Decreased By ▼ -0.03 (-0.28%)
POWER 13.54 Increased By ▲ 1.23 (9.99%)
PPL 170.60 Decreased By ▼ -0.30 (-0.18%)
PRL 34.61 Increased By ▲ 0.34 (0.99%)
PTC 22.62 Decreased By ▼ -0.24 (-1.05%)
SEARL 96.00 Increased By ▲ 1.05 (1.11%)
SSGC 43.25 Increased By ▲ 0.78 (1.84%)
SYM 14.23 Increased By ▲ 0.04 (0.28%)
TELE 7.26 Increased By ▲ 0.05 (0.69%)
TPLP 9.90 Decreased By ▼ -0.01 (-0.1%)
TRG 65.69 Increased By ▲ 0.14 (0.21%)
WAVESAPP 9.80 Decreased By ▼ -0.05 (-0.51%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
YOUW 3.78 Increased By ▲ 0.02 (0.53%)
BR100 12,705 Increased By 116.3 (0.92%)
BR30 38,281 Increased By 402 (1.06%)
KSE100 118,316 Increased By 1000.3 (0.85%)
KSE30 36,388 Increased By 271.1 (0.75%)

The European Investment Bank (EIB) has financed about Euro 223.6 million for Pakistan's five energy and power projects since 1995 following a framework agreement between the bank and Pakistani government in 1994.
According to official documents, the EIB started financing activities in Asia in 1993 and granted loans worth more than EUR 5.1 billion for projects in Asia, of which Euro 223.6 million in Pakistan, making it the fourth largest recipient in Asia after China, India and Vietnam.
The recent declaratory statement for Euro 100 million for co financing 128 megawatt (MW) Keyal Khwar Hydropower Project in Khyber Pakhtunkhwa province of the country was also signed last month between Economic Affairs Division and EIB.
The Keyal Khwar project, that is scheduled to be completed in four years, will be built in Dasu district of Khyber-Pakhtunkhwa on the right tributary of the Indus river. Water and Power Development Authority (WAPDA) will implement the project while the project consists of a 128MW run-of-river hydropower plant with a small. 1.5 hector reservoir for daily regulation.
The EIB provided Euro 35 million in 2006 for DG Khan Cement Project which envisaged construction and operation of a cement plant on a Greenfield site with a capacity of 2.2 million tons of cement per year to cater to domestic needs.
EIB also provided Euro 43.6 million in 2003 for White Oil Pipeline project which consists of construction and operation of a 782 kilometres long oil pipeline for transportation of white oil (refined petroleum) from Karachi to Mahmood Kot near Multan.
The bank provided 21 million euro in 1997 for Ghazi-Barotha Hydropower (b). The project consisted of the design, construction and commissioning a run-of-the-river hydropower complex with installed capacity of 1,450 megawatt, generating 6.600GWh of energy per annum.
Earlier, the bank had provided 24 million euro for Ghazi-Barotha Hydropower (a) which consisted design, construction and commissioning a run-of-the-river hydropower complex with installed capacity of 1,450 megawatt, generating 6.600GWh of energy per annum.

Copyright Associated Press of Pakistan, 2014

Comments

Comments are closed.