AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

SSGC's Meter Manufacturing Plant achieved a record production of 750,001 gas meters, two months before the closing of the financial year 2013-14. This remarkable feat of the Meter Plant's management and workers was acknowledged at a ceremony called 'Celebration of Achievement', held at the Plant's premises on Monday in which Zuhair Siddiqui, MD, SSGC was the chief guest.
What was even more outstanding about the achievement was that the rejection rates for both the G-4 and G-1.6 meters were the lowest ever in the meter plant's history. In his address, the MD SSGC reiterated that the Meter Plant has always raised the performance bar through constant business process re-engineering. On the occasion, he announced a 5 percent salary hike of HR and 3rd party workers and Rs 3,000 bonus for the workers of the plant.
Irfan Zafar, Sr General Manager (Operations) applauded the determination and hard work of the facility workers and said that no matter how ambitious the targets are quality of production must never be compromised. Earlier, Saeed Rizvi, GM (Meter Plant) gave a comprehensive overview about the production trend of the Plant for the last 10 years as well as future projections and plans. He said that the total number of components required for assembling G-1.6 and G-4 gas meters are 57 and 49, respectively. Rizvi said that on average 130 seconds are spent on producing a single meter. He further added that the Plant manufactures 2,200 G-4 units and 750 G-1.6 units per day. The GM said that by the end of the current fiscal year, that the target is 880,000 meters while the projection for the FY 2014-15 is 1,000,000 units.
On behalf of the workers, Aslam Rajput, Chairman, PLU (CBA) assured the management of their continued dedication and hard work. Fayyaz Merchant, Sr General Manager (Engineering Services) presented a memento to the MD. Two of the meter plant's personnel presented MD with a chrome model of G-1.6 meter. Earlier, the MD was also briefed on various stages of production, right from the fixing of diaphragm assembly to the underwater leak testing of the unit produced.-PR

Copyright Business Recorder, 2014

Comments

Comments are closed.