AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.23 Decreased By ▼ -0.02 (-0.2%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.60 Decreased By ▼ -1.04 (-5.9%)
FLYNG 22.45 Increased By ▲ 0.63 (2.89%)
HUBC 126.60 Decreased By ▼ -2.51 (-1.94%)
HUMNL 13.83 Decreased By ▼ -0.03 (-0.22%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.35 Decreased By ▼ -0.58 (-8.37%)
MLCF 42.10 Decreased By ▼ -1.53 (-3.51%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 40.30 Decreased By ▼ -0.87 (-2.11%)
PIAHCLA 16.85 Increased By ▲ 0.02 (0.12%)
PIBTL 8.25 Decreased By ▼ -0.38 (-4.4%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 182.89 Decreased By ▼ -0.14 (-0.08%)
PRL 38.10 Decreased By ▼ -1.53 (-3.86%)
PTC 23.90 Decreased By ▼ -0.83 (-3.36%)
SEARL 93.50 Decreased By ▼ -4.51 (-4.6%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.85 Decreased By ▼ -1.88 (-4.51%)
SYM 18.44 Decreased By ▼ -0.42 (-2.23%)
TELE 8.66 Decreased By ▼ -0.34 (-3.78%)
TPLP 12.05 Decreased By ▼ -0.35 (-2.82%)
TRG 64.50 Decreased By ▼ -1.18 (-1.8%)
WAVESAPP 10.50 Decreased By ▼ -0.48 (-4.37%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 3.96 Decreased By ▼ -0.07 (-1.74%)
BR100 11,697 Decreased By -168.8 (-1.42%)
BR30 35,252 Decreased By -445.3 (-1.25%)
KSE100 112,638 Decreased By -1510.2 (-1.32%)
KSE30 35,458 Decreased By -494 (-1.37%)

Operation of Blast Furnace is quite complex in nature that relies on multiple technological aspect. To keep its operation in the safe zone it has to be operated non-stop on its rated capacity. Extended low production process is very detrimental for Blast Furnace refractory which unfortunately has been done perforce during last couple of years due to shortage of raw material. It has to be realised that Pakistan Steel Mills Blast Furnace No 1 was relined in 1996 and from then it is being operated continuously. As per the experts opinion, the normal refractory life of the Blast Furnace is 18 to 20 years. So Blast Furnace No 1 is already mature for its complete relining. As the furnace was operated at a very low capacity during the last 3-4 years that has scratched the inner profile of the furnace.
Under these conditions there certainly exist some weak areas especially in the hearth of the furnace which encounter very high degree of temperature ie 1500-1600°C and highly corrosive slag which may blow-up during operation in specific circumstance as stated above. When the production rate is being boosted up, the weak areas inside the furnace are exposed and such an incident can occur as happened on 9th October 2014 at Blast Furnace No 1. However, it is a routine process failure that can happen in such a huge process industry. The state of affairs is, however, being tackled with extraordinary skill and proficiency coupled with hard work of PSM engineers and technicians.
PSM senior management and Executive Management Committee are very cautions in the matter and intimately monitoring the restoration work round the clock to restart the furnace in the minimum possible time. A facts finding investigation has been ordered immediately after the incident to unearth the route causes of the incident and to find out the person(s) responsible, if any and to suggest the steps to be taken to avoid re-occurrence of such incidents in future.
PSM Management is much confident to regain its pace of production at Blast Furnace No 1 within next couple of days. PSM Management is also in close liaison with the Government to arrange the essentially required funds to carry out the capital repair of some of its major units including blast furnace No 1 & Steel Converters. Documentation and spade work is being completed on a fast track so that after getting clearance from the government these capital repairs can be taken up on priority for achieving sustainable and reliable production from the units.

Copyright Business Recorder, 2014

Comments

Comments are closed.