AIRLINK 208.80 Decreased By ▼ -4.02 (-1.89%)
BOP 10.26 Increased By ▲ 0.01 (0.1%)
CNERGY 6.85 Decreased By ▼ -0.15 (-2.14%)
FCCL 33.70 Increased By ▲ 0.23 (0.69%)
FFL 17.10 Decreased By ▼ -0.54 (-3.06%)
FLYNG 21.62 Decreased By ▼ -0.20 (-0.92%)
HUBC 129.50 Increased By ▲ 0.39 (0.3%)
HUMNL 14.04 Increased By ▲ 0.18 (1.3%)
KEL 4.76 Decreased By ▼ -0.10 (-2.06%)
KOSM 6.90 Decreased By ▼ -0.03 (-0.43%)
MLCF 43.25 Decreased By ▼ -0.38 (-0.87%)
OGDC 216.30 Increased By ▲ 3.35 (1.57%)
PACE 7.16 Decreased By ▼ -0.06 (-0.83%)
PAEL 42.22 Increased By ▲ 1.05 (2.55%)
PIAHCLA 17.02 Increased By ▲ 0.19 (1.13%)
PIBTL 8.41 Decreased By ▼ -0.22 (-2.55%)
POWER 8.88 Increased By ▲ 0.07 (0.79%)
PPL 185.50 Increased By ▲ 2.47 (1.35%)
PRL 39.44 Decreased By ▼ -0.19 (-0.48%)
PTC 24.75 Increased By ▲ 0.02 (0.08%)
SEARL 98.99 Increased By ▲ 0.98 (1%)
SILK 1.01 No Change ▼ 0.00 (0%)
SSGC 40.99 Decreased By ▼ -0.74 (-1.77%)
SYM 18.45 Decreased By ▼ -0.41 (-2.17%)
TELE 9.27 Increased By ▲ 0.27 (3%)
TPLP 12.24 Decreased By ▼ -0.16 (-1.29%)
TRG 65.51 Decreased By ▼ -0.17 (-0.26%)
WAVESAPP 10.89 Decreased By ▼ -0.09 (-0.82%)
WTL 1.87 Increased By ▲ 0.08 (4.47%)
YOUW 4.08 Increased By ▲ 0.05 (1.24%)
BR100 11,862 Decreased By -3.9 (-0.03%)
BR30 35,945 Increased By 247.4 (0.69%)
KSE100 114,165 Increased By 16.4 (0.01%)
KSE30 35,940 Decreased By -12.4 (-0.03%)

Minister for Planning and Development Ahsan Iqbal has said the Liquefied Natural Gas (LNG) terminal will be completed by February next year. He was speaking at a meeting of Pakistan Engineering Council''s (PEC) energy sector''s think tank held here on Saturday. The minister said that the LNG terminal would help a lot in overcoming energy crisis in the country. Ahsan Iqbal said engineers have been playing a vital role in overcoming energy crisis in the country.

Copyright News Network International, 2014

Comments

Comments are closed.