Sui Southern Gas Company (SSGC) would provide desired level of gas pressure to all CNG stations during the winter season. This was stated by Managing Director of SSGC Shoaib Warasi in a meeting with a delegation of All Pakistan CNG Association (APCNGA) Sindh Zone.
The delegation led by its Chairman Shabbir Sulemanjee called on him at SSGC head office and discussed with him the grievances being faced by the CNG sector.
The MD SSGC explained in detail the current gas supply position due to winters resulting in extreme low pressures in the system.
However, he said that the company would provide gas to the CNG sector as per gas load shedding schedule which will be three days a week during the winter season.
Comments
Comments are closed.