AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.23 Decreased By ▼ -0.02 (-0.2%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.60 Decreased By ▼ -1.04 (-5.9%)
FLYNG 22.45 Increased By ▲ 0.63 (2.89%)
HUBC 126.60 Decreased By ▼ -2.51 (-1.94%)
HUMNL 13.83 Decreased By ▼ -0.03 (-0.22%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.35 Decreased By ▼ -0.58 (-8.37%)
MLCF 42.10 Decreased By ▼ -1.53 (-3.51%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 40.30 Decreased By ▼ -0.87 (-2.11%)
PIAHCLA 16.85 Increased By ▲ 0.02 (0.12%)
PIBTL 8.25 Decreased By ▼ -0.38 (-4.4%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 182.89 Decreased By ▼ -0.14 (-0.08%)
PRL 38.10 Decreased By ▼ -1.53 (-3.86%)
PTC 23.90 Decreased By ▼ -0.83 (-3.36%)
SEARL 93.50 Decreased By ▼ -4.51 (-4.6%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.85 Decreased By ▼ -1.88 (-4.51%)
SYM 18.44 Decreased By ▼ -0.42 (-2.23%)
TELE 8.66 Decreased By ▼ -0.34 (-3.78%)
TPLP 12.05 Decreased By ▼ -0.35 (-2.82%)
TRG 64.50 Decreased By ▼ -1.18 (-1.8%)
WAVESAPP 10.50 Decreased By ▼ -0.48 (-4.37%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 3.96 Decreased By ▼ -0.07 (-1.74%)
BR100 11,697 Decreased By -168.8 (-1.42%)
BR30 35,252 Decreased By -445.3 (-1.25%)
KSE100 112,638 Decreased By -1510.2 (-1.32%)
KSE30 35,458 Decreased By -494 (-1.37%)

Independent grid stations and feeders would be established for the industrial zones and estates in MEPCO region and the transmission system would be upgraded to improve power supply to consumers. This was stated by Chief Executive Officer, Multan Electric Power Company (Mepco), Muzaffar Ali Abbasi, while speaking at the executive committee meeting of Multan Chamber of Commerce and Industry here on Friday.
The meeting was chaired by Mian Iqbal Hassan, President MCCI. Abbasi said that 500-kilometre long Aerial Bundle Cable (ABC) would be laid in the walled city of Multan to avert any accident in the narrow streets in future. "This cable is water and fire proof and it would also help in minimising the line losses and power theft," he added. He assured the business community that power loadshedding schedule in business areas would be finalised with mutual consultations.
He admitted that Mepco was unable to provide new connections to applicants despite receiving Rs 1000 million from them. He assured that all pending applications would be cleared till December 31, 2014. Abbasi said that Mepco was the second largest distribution company with 5 million consumers. On the demand of Chamber, Abbasi appointed Engineer Shahid Hameed, Superintending Engineer, as focal person to address the complaints of industrialists and traders fortnightly in Multan chamber.

Copyright Business Recorder, 2014

Comments

Comments are closed.