AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.23 Decreased By ▼ -0.02 (-0.2%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.60 Decreased By ▼ -1.04 (-5.9%)
FLYNG 22.45 Increased By ▲ 0.63 (2.89%)
HUBC 126.60 Decreased By ▼ -2.51 (-1.94%)
HUMNL 13.83 Decreased By ▼ -0.03 (-0.22%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.35 Decreased By ▼ -0.58 (-8.37%)
MLCF 42.10 Decreased By ▼ -1.53 (-3.51%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 40.30 Decreased By ▼ -0.87 (-2.11%)
PIAHCLA 16.85 Increased By ▲ 0.02 (0.12%)
PIBTL 8.25 Decreased By ▼ -0.38 (-4.4%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 182.89 Decreased By ▼ -0.14 (-0.08%)
PRL 38.10 Decreased By ▼ -1.53 (-3.86%)
PTC 23.90 Decreased By ▼ -0.83 (-3.36%)
SEARL 93.50 Decreased By ▼ -4.51 (-4.6%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.85 Decreased By ▼ -1.88 (-4.51%)
SYM 18.44 Decreased By ▼ -0.42 (-2.23%)
TELE 8.66 Decreased By ▼ -0.34 (-3.78%)
TPLP 12.05 Decreased By ▼ -0.35 (-2.82%)
TRG 64.50 Decreased By ▼ -1.18 (-1.8%)
WAVESAPP 10.50 Decreased By ▼ -0.48 (-4.37%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 3.96 Decreased By ▼ -0.07 (-1.74%)
BR100 11,697 Decreased By -168.8 (-1.42%)
BR30 35,252 Decreased By -445.3 (-1.25%)
KSE100 112,638 Decreased By -1510.2 (-1.32%)
KSE30 35,458 Decreased By -494 (-1.37%)

The consortium working on the extensive Panama Canal expansion has submitted two new claims for cost overruns of almost $740 million, the canal administrator said on Friday. A dispute between the canal and the consortium over cost overruns temporarily halted work on the expansion earlier this year and arguments over the project are now being heard in an arbitration court in Miami.
The consortium, Grupo Unidos por el Canal, formed by Spain's Sacyr, Italy's Salini Impregilo, Belgium's Jan de Nul as well as the Panamanian company CUSA, has now presented a total of about $2.3 billion in claims for overruns, said Panama Canal Authority administrator Jorge Quijano.
"We're not taking these claims at face value," said Quijano. "We've received claims (previously) that, upon review by a third party, have ended in nothing."
Hold-ups on the engineering project, which centers on the construction of a third set of locks, have left trading nations waiting anxiously to start moving a new generation of large container ships and liquefied gas tankers along the 50-mile shortcut between the Atlantic and Pacific oceans.
The section to build the new locks was originally supposed to cost $3.2 billion.

Copyright Reuters, 2014

Comments

Comments are closed.