AIRLINK 206.75 Decreased By ▼ -6.07 (-2.85%)
BOP 10.15 Decreased By ▼ -0.10 (-0.98%)
CNERGY 6.68 Decreased By ▼ -0.32 (-4.57%)
FCCL 33.20 Decreased By ▼ -0.27 (-0.81%)
FFL 16.70 Decreased By ▼ -0.94 (-5.33%)
FLYNG 22.25 Increased By ▲ 0.43 (1.97%)
HUBC 128.00 Decreased By ▼ -1.11 (-0.86%)
HUMNL 14.07 Increased By ▲ 0.21 (1.52%)
KEL 4.78 Decreased By ▼ -0.08 (-1.65%)
KOSM 6.40 Decreased By ▼ -0.53 (-7.65%)
MLCF 42.43 Decreased By ▼ -1.20 (-2.75%)
OGDC 213.60 Increased By ▲ 0.65 (0.31%)
PACE 7.00 Decreased By ▼ -0.22 (-3.05%)
PAEL 41.30 Increased By ▲ 0.13 (0.32%)
PIAHCLA 16.77 Decreased By ▼ -0.06 (-0.36%)
PIBTL 8.35 Decreased By ▼ -0.28 (-3.24%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 184.10 Increased By ▲ 1.07 (0.58%)
PRL 38.85 Decreased By ▼ -0.78 (-1.97%)
PTC 24.35 Decreased By ▼ -0.38 (-1.54%)
SEARL 97.85 Decreased By ▼ -0.16 (-0.16%)
SILK 1.03 Increased By ▲ 0.02 (1.98%)
SSGC 40.50 Decreased By ▼ -1.23 (-2.95%)
SYM 18.08 Decreased By ▼ -0.78 (-4.14%)
TELE 8.97 Decreased By ▼ -0.03 (-0.33%)
TPLP 12.40 No Change ▼ 0.00 (0%)
TRG 65.20 Decreased By ▼ -0.48 (-0.73%)
WAVESAPP 10.51 Decreased By ▼ -0.47 (-4.28%)
WTL 1.82 Increased By ▲ 0.03 (1.68%)
YOUW 4.03 No Change ▼ 0.00 (0%)
BR100 11,802 Decreased By -64.6 (-0.54%)
BR30 35,628 Decreased By -69.4 (-0.19%)
KSE100 113,262 Decreased By -886.7 (-0.78%)
KSE30 35,636 Decreased By -316.2 (-0.88%)

This is apropos to a news item published in the national newspapers on February 24 2015, with the caption "Load shedding won't end by 2020" Nepra has clarified that while referring to Nepra A State of Industry Report 2014 have completely failed to divulge upon the context in which the matter has been discussed in the report.
The relevant tables and the accompanying paragraphs provide peak time statistics about installed capacity, and the projected demands in NTDC and K-Electric systems. It may be noted that while the peak demand in the NTDC system stands at 23,242 MW in 2014-15 the installed capacity is almost equal to it as 23,928 MW. Over the coming years, it is planned to add new power generation capacity as follows as indicated in the report:



====================
2015-16 593 MW
2016-17 3380 MW
2017-18 4261 MW
2018-19 3561 MW
2019-20 3940 MW
====================

With the result that by 2019-20 against a demand of 28,773 MW, the installed capacity in the NTDC's system is expected to be 39,663 MW. Nepra report in succeeding paragraph touches upon the gap between the expected capability of the plants and the demand, only at the Peak Time. Even such a gap at peak time gradually reduces and it is projected to be less than 1000 MW by 2018-19, whereas in 2019-20 a complete turnaround has been projected with a surplus of more than 1100 MW at the peak time. It is also to be noted that the Report in the same paragraph emphasises that timely completion of projects, performance improvements and elimination of fuel constraints will provide relief to consumers.
Nowhere does Nepra report refer to load shedding as has been referred by the media reports. By not providing underlying facts and ignoring the subsequent observations the news reports have presented a distorted picture.
Copyright Business Recorder, 2015

Comments

Comments are closed.