AGL 37.72 Decreased By ▼ -0.22 (-0.58%)
AIRLINK 168.65 Increased By ▲ 13.43 (8.65%)
BOP 9.09 Increased By ▲ 0.02 (0.22%)
CNERGY 6.85 Increased By ▲ 0.13 (1.93%)
DCL 10.05 Increased By ▲ 0.52 (5.46%)
DFML 40.64 Increased By ▲ 0.33 (0.82%)
DGKC 93.24 Increased By ▲ 0.29 (0.31%)
FCCL 37.92 Decreased By ▼ -0.46 (-1.2%)
FFBL 78.72 Increased By ▲ 0.14 (0.18%)
FFL 13.46 Decreased By ▼ -0.14 (-1.03%)
HUBC 114.10 Increased By ▲ 3.91 (3.55%)
HUMNL 14.95 Increased By ▲ 0.06 (0.4%)
KEL 5.75 Increased By ▲ 0.02 (0.35%)
KOSM 8.23 Decreased By ▼ -0.24 (-2.83%)
MLCF 45.49 Decreased By ▼ -0.17 (-0.37%)
NBP 74.92 Decreased By ▼ -1.25 (-1.64%)
OGDC 192.93 Increased By ▲ 1.06 (0.55%)
PAEL 32.24 Increased By ▲ 1.76 (5.77%)
PIBTL 8.57 Increased By ▲ 0.41 (5.02%)
PPL 167.38 Increased By ▲ 0.82 (0.49%)
PRL 31.01 Increased By ▲ 1.57 (5.33%)
PTC 22.08 Increased By ▲ 2.01 (10.01%)
SEARL 100.83 Increased By ▲ 4.21 (4.36%)
TELE 8.45 Increased By ▲ 0.18 (2.18%)
TOMCL 34.84 Increased By ▲ 0.58 (1.69%)
TPLP 11.24 Increased By ▲ 1.02 (9.98%)
TREET 18.63 Increased By ▲ 0.97 (5.49%)
TRG 60.74 Decreased By ▼ -0.51 (-0.83%)
UNITY 31.98 Increased By ▲ 0.01 (0.03%)
WTL 1.61 Increased By ▲ 0.14 (9.52%)
BR100 11,289 Increased By 73.1 (0.65%)
BR30 34,140 Increased By 489.6 (1.45%)
KSE100 105,104 Increased By 545.3 (0.52%)
KSE30 32,554 Increased By 188.3 (0.58%)

The Sehra Hydropower project is located on the Punch River, upstream of the confluence of the Mendla Nullah with the Punch River in the AJ&K approx. 65km from the Mangla Dam.
The Project feasibility study was carried out by Farab, Iran and approved by the Panel of Experts. The study envisages a total installed capacity of 130 MW with a design discharge of 118 cumecs and net head of 126 meters.
The successful completion of this Project will add 732 GWh of clean energy to the National Grid every year.

Copyright Business Recorder, 2015

Comments

Comments are closed.