AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

The Technology Upgradation and Skill Development Company (TUSDEC) has completed training of the first batch of 25 solar technicians from various districts of Punjab and distributed certificates in a ceremony. In the verve of technology sophistication and skill development to uplift the local industry, the company has joined hands with the Punjab Skills Development Fund to foster the renewable energy sector.
The project is being implemented under the Skills for Job 2014-15 which aimed at contemporary skills development in the discipline of solar technology among the disadvantaged youth.
A company spokesman said his company was expected to enroll 75 candidates from Lahore, Sheikhupura, Faisalabad, Chiniot, Sargodha, Gujranwala and Narowal, in the breakdown of three batches to be trained in the area of photovoltaics. The overall project duration is stretched over one year where each course will be extended for a span of three months.
He said the prime focus is on feasibility designing, site inspections, system sizing, system installation, system handover and troubleshooting of grid tied, off grid, hybrid and tube well systems enabling the trainees to serve productively in the approaching industry.
He also said the solar lab at NIDA in Lahore had been outfitted with the most modern equipment to punctuate focus on practical training for expeditious absorption of graduates in the job market.

Copyright Business Recorder, 2015

Comments

Comments are closed.