AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

The World Bank has approved US $188 million to improve the reliability and safety of the Guddu Barrage and strengthen the Sindh Irrigation Department's capacity to operate and manage the barrages. Sindh Barrages Improvement Project (SBIP) under which the Guddu Barrage rehabilitation will be carried out is needed due to natural ageing of the infrastructure. The rehabilitation work will eliminate possible sources of failure and potentially give the structure another 50 years of life.
"Barrages are strategic assets of Sindh and millions of people depend on the water that is controlled, diverted, and managed by them. Their continued operation and management require specialized expertise, experience, decision making, and continuity of operation", says Rachid Benmessaoud, World Bank Country Director for Pakistan. "In addition to physical rehabilitation of barrage infrastructure, this project will also support the Sindh Government in training and technical assistance in procurement, financial, social and environmental safeguards for operating hydraulic irrigation infrastructure."
The SBIP will support the gate replacement works to improve the regulation and the flow of the barrage, the replacement of all 65 main barrage steel gates, 25 main canal head regulator gates, and hoist gears including all mechanical and electrical equipment. This project will also finance the independent Panel of Experts, who will review, monitor, evaluate, and help guide the rehabilitation process with regards to the safety of the barrage.
"The Guddu barrage constitutes the most strategic component of the large Indus Basin Irrigation System. The effective operation and structural stability are important for agricultural production and for averting potential disaster during floods. Climate variability will further add to risks by changing the frequency and intensity of extreme events such as floods and droughts", says Abdul Hamid Azad, the Task Team Leader of the Project. "Thus, 'no intervention' is not an option."-PR

Copyright Business Recorder, 2015

Comments

Comments are closed.