AIRLINK 212.90 Increased By ▲ 3.35 (1.6%)
BOP 10.31 Decreased By ▼ -0.15 (-1.43%)
CNERGY 7.14 Decreased By ▼ -0.21 (-2.86%)
FCCL 34.05 Decreased By ▼ -0.34 (-0.99%)
FFL 18.08 Increased By ▲ 0.03 (0.17%)
FLYNG 22.85 Decreased By ▼ -0.07 (-0.31%)
HUBC 130.30 Decreased By ▼ -2.19 (-1.65%)
HUMNL 14.28 Increased By ▲ 0.14 (0.99%)
KEL 5.02 Decreased By ▼ -0.01 (-0.2%)
KOSM 7.05 Decreased By ▼ -0.02 (-0.28%)
MLCF 44.60 Decreased By ▼ -0.60 (-1.33%)
OGDC 217.90 Decreased By ▼ -0.48 (-0.22%)
PACE 7.69 Increased By ▲ 0.11 (1.45%)
PAEL 41.85 Increased By ▲ 0.15 (0.36%)
PIAHCLA 17.35 Increased By ▲ 0.05 (0.29%)
PIBTL 8.75 Increased By ▲ 0.20 (2.34%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 187.00 Decreased By ▼ -2.03 (-1.07%)
PRL 41.55 Decreased By ▼ -0.78 (-1.84%)
PTC 25.49 Increased By ▲ 0.32 (1.27%)
SEARL 102.00 Decreased By ▼ -1.96 (-1.89%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 40.77 Increased By ▲ 1.53 (3.9%)
SYM 19.24 Increased By ▲ 0.08 (0.42%)
TELE 9.19 Decreased By ▼ -0.05 (-0.54%)
TPLP 12.79 Decreased By ▼ -0.31 (-2.37%)
TRG 68.68 Decreased By ▼ -0.50 (-0.72%)
WAVESAPP 10.70 Decreased By ▼ -0.02 (-0.19%)
WTL 1.90 Increased By ▲ 0.19 (11.11%)
YOUW 4.10 Decreased By ▼ -0.04 (-0.97%)
BR100 12,081 Increased By 1.8 (0.01%)
BR30 36,472 Decreased By -130.2 (-0.36%)
KSE100 115,979 Decreased By -74 (-0.06%)
KSE30 36,538 Decreased By -40 (-0.11%)

Prime Minister Nawaz Sharif has said overcoming terrorism and electricity shortage is the top priority of the government. He was talking to German Ambassador to Pakistan Dr Cyrill Nunn who called on him in Islamabad on Friday. The Prime Minister lauded German Ambassador for strengthening bilateral relations between the two countries. Meanwhile, it is reported that electricity shortfall has reached at least 4,400MW leading to increased hours of outages countrywide.
At least 12-hour long outages are being carried out in rural while eight-hour long in urban areas. It is reported that the demand of electricity is 19,300MW whereas the production is 14,900MW. The shortfall has reached 4,400MW due to increase in power demand. Besides this, duration of load shedding in areas going through line losses is more than 12 hours.

Copyright News Network International, 2015

Comments

Comments are closed.