AIRLINK 212.50 Increased By ▲ 2.95 (1.41%)
BOP 10.51 Increased By ▲ 0.05 (0.48%)
CNERGY 7.25 Decreased By ▼ -0.10 (-1.36%)
FCCL 34.50 Increased By ▲ 0.11 (0.32%)
FFL 18.05 No Change ▼ 0.00 (0%)
FLYNG 23.26 Increased By ▲ 0.34 (1.48%)
HUBC 131.30 Decreased By ▼ -1.19 (-0.9%)
HUMNL 14.30 Increased By ▲ 0.16 (1.13%)
KEL 5.06 Increased By ▲ 0.03 (0.6%)
KOSM 7.19 Increased By ▲ 0.12 (1.7%)
MLCF 45.10 Decreased By ▼ -0.10 (-0.22%)
OGDC 219.51 Increased By ▲ 1.13 (0.52%)
PACE 7.65 Increased By ▲ 0.07 (0.92%)
PAEL 42.30 Increased By ▲ 0.60 (1.44%)
PIAHCLA 17.52 Increased By ▲ 0.22 (1.27%)
PIBTL 8.67 Increased By ▲ 0.12 (1.4%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 190.50 Increased By ▲ 1.47 (0.78%)
PRL 42.50 Increased By ▲ 0.17 (0.4%)
PTC 25.78 Increased By ▲ 0.61 (2.42%)
SEARL 103.52 Decreased By ▼ -0.44 (-0.42%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 41.10 Increased By ▲ 1.86 (4.74%)
SYM 19.30 Increased By ▲ 0.14 (0.73%)
TELE 9.38 Increased By ▲ 0.14 (1.52%)
TPLP 13.00 Decreased By ▼ -0.10 (-0.76%)
TRG 70.25 Increased By ▲ 1.07 (1.55%)
WAVESAPP 10.67 Decreased By ▼ -0.05 (-0.47%)
WTL 1.70 Decreased By ▼ -0.01 (-0.58%)
YOUW 4.20 Increased By ▲ 0.06 (1.45%)
BR100 12,162 Increased By 82.6 (0.68%)
BR30 36,797 Increased By 194.7 (0.53%)
KSE100 116,859 Increased By 806 (0.69%)
KSE30 36,845 Increased By 267.1 (0.73%)

K-Electric held inauguration ceremonies of eight new PMT's that were strategically installed in key areas of Gulistan-e-Johar in a bid to manage and equally distribute load on the existing PMT's within the vicinity. Iqbal Muhammad Ali Khan, MNA and Faisal Sabzwari, MPA were present at the inauguration ceremonies along with KE Team.
According to details, the previously installed PMT's were overloaded due to which frequent issues such as tripping, over-heating and breakdowns were faced by the customers on a regular basis within the area. In order to efficiently tackle this persisting issue, strategic invests in the enhancement of the pre-installed PMT's were undertaken that would not only lessen the load on the existing PMT's, rather also equally distribute the load in order to mitigate the frequency of technical faults within the locale.
KE spokesperson at this occasion added, 'the eight newly installed PMT's within the IBC Johar area are examples of strategic planning to improve and advance our networks that in the long run will not only reduce tripping, faults and breakdowns for KE response teams but will offer quality services to our valued customers.-PR

Copyright Business Recorder, 2015

Comments

Comments are closed.