AIRLINK 192.46 Decreased By ▼ -3.92 (-2%)
BOP 10.23 Increased By ▲ 0.12 (1.19%)
CNERGY 7.53 Decreased By ▼ -0.22 (-2.84%)
FCCL 38.10 No Change ▼ 0.00 (0%)
FFL 15.41 Decreased By ▼ -0.33 (-2.1%)
FLYNG 24.82 Increased By ▲ 0.28 (1.14%)
HUBC 128.08 Decreased By ▼ -2.30 (-1.76%)
HUMNL 13.77 Increased By ▲ 0.04 (0.29%)
KEL 4.44 Decreased By ▼ -0.16 (-3.48%)
KOSM 6.21 Increased By ▲ 0.02 (0.32%)
MLCF 44.62 Decreased By ▼ -0.23 (-0.51%)
OGDC 202.69 Decreased By ▼ -3.82 (-1.85%)
PACE 6.63 Increased By ▲ 0.05 (0.76%)
PAEL 37.95 Decreased By ▼ -1.82 (-4.58%)
PIAHCLA 17.01 Decreased By ▼ -0.19 (-1.1%)
PIBTL 7.84 Decreased By ▼ -0.15 (-1.88%)
POWER 9.40 Increased By ▲ 0.20 (2.17%)
PPL 175.05 Decreased By ▼ -3.86 (-2.16%)
PRL 37.34 Decreased By ▼ -1.59 (-4.08%)
PTC 23.45 Decreased By ▼ -0.86 (-3.54%)
SEARL 104.89 Decreased By ▼ -4.38 (-4.01%)
SILK 1.01 Increased By ▲ 0.01 (1%)
SSGC 36.90 Decreased By ▼ -0.85 (-2.25%)
SYM 18.26 Decreased By ▼ -0.57 (-3.03%)
TELE 8.27 Decreased By ▼ -0.26 (-3.05%)
TPLP 12.13 Decreased By ▼ -0.01 (-0.08%)
TRG 63.98 Decreased By ▼ -0.78 (-1.2%)
WAVESAPP 11.72 Decreased By ▼ -0.39 (-3.22%)
WTL 1.63 Decreased By ▼ -0.01 (-0.61%)
YOUW 3.89 Increased By ▲ 0.02 (0.52%)
BR100 11,856 Decreased By -143.8 (-1.2%)
BR30 34,973 Decreased By -575 (-1.62%)
KSE100 112,745 Decreased By -1510.7 (-1.32%)
KSE30 35,360 Decreased By -509.9 (-1.42%)

The Provincial Development Working Party Punjab approved twelve development schemes of various development Sectors with an estimated cost of Rs 59,057.572 million including Punjab Police Integrated Command, Control & Communication (PP-IC3) Programme at the cost of Rs 13.387.679 billion. These schemes were approved in the 4th meeting of Provincial Development Working Party (PDWP) of current fiscal year 2015-16 presided over by the Punjab Chairman P&D Board Muhammad Irfan Elahi.
Members of the Planning & Development Board, Provincial Secretary concerned and other senior representatives of the relevant Provincial Departments also attended the meeting. According to P&DD spokesman the approved development schemes included:
1. Punjab Police Integrated Command, Control & Communication (PP-IC3) Programme at the cost of Rs 13,387.679 million,
2. Preservation & Restoration of Shahdara Complex of Monuments (Revised) at the cost of Rs 467.990 million,
3. Lahore Ring Road Project - Southern Loop (Package-1) (Land Acquisition and Relocation of Utilities) at the cost of Rs 5425.595 million,
4. Lahore Ring Road Project - Southern Loop (Package-2) (Land Acquisition and Relocation of Utilities) (Revised) at the cost of Rs 9956.594 million,
5. Lahore Ring Road Project - Southern Loop (Package-3) (Land Acquisition and Relocation of Utilities) at the cost of Rs 5820.664 million,
6. Lahore Ring Road (Package-9) Construction of Interchange at Harbanspura Canal Crossing (Revised) at the cost of Rs 2376.215 million,
7. Improvement / Rehabilitation of Existing Multan Road, Lahore from Thokar Niaz Baig to Chauburji (Proposed Sewerage Drainage and Water Supply System) Package-III. (Revised) at the cost of Rs 2045.751 million,
8 Rehabilitation/Widening of 10'-12' Rural Roads under "Khadim-e-Punjab Roads Programme (KPRP)" (South Zone) at the cost of Rs 8025.058 million,
9. Khadim-e-Punjab Roads Program (KPRP) (Rehabilitation & Widening of (Rural) Roads in Punjab Highways Department, North Zone) (Umbrella PC-I) (Revised) at the cost of Rs 9892.000 million,
10. Widening / Improvement of road from Ouderwal to Nila Road length 43.00 Km District Chakwal at the cost of Rs 782.995 million
11. Topographic Survey and Geotechnical Studies for Land Sliding Zonization of Murree Hill Area Mainly located between old Rawalpindi - Murree Road and Islamabad Murree Expressway in Murree (Amended) at the cost of Rs 50.000 million and;
12. Establishment of Directorate General of Monitoring and Evaluation at the cost of Rs 827.031 million.

Copyright Business Recorder, 2015

Comments

Comments are closed.