AGL 37.80 Increased By ▲ 0.30 (0.8%)
AIRLINK 218.50 Decreased By ▼ -4.39 (-1.97%)
BOP 10.93 Increased By ▲ 0.11 (1.02%)
CNERGY 7.57 Increased By ▲ 0.01 (0.13%)
DCL 9.16 Decreased By ▼ -0.26 (-2.76%)
DFML 40.35 Decreased By ▼ -0.61 (-1.49%)
DGKC 102.11 Decreased By ▼ -4.65 (-4.36%)
FCCL 34.95 Decreased By ▼ -2.12 (-5.72%)
FFL 19.50 Increased By ▲ 0.26 (1.35%)
HASCOL 12.70 Decreased By ▼ -0.48 (-3.64%)
HUBC 131.00 Decreased By ▼ -1.64 (-1.24%)
HUMNL 14.59 Decreased By ▼ -0.14 (-0.95%)
KEL 5.19 Decreased By ▼ -0.21 (-3.89%)
KOSM 7.35 Decreased By ▼ -0.13 (-1.74%)
MLCF 45.80 Decreased By ▼ -2.38 (-4.94%)
NBP 66.04 Decreased By ▼ -0.25 (-0.38%)
OGDC 223.50 Increased By ▲ 0.24 (0.11%)
PAEL 44.30 Increased By ▲ 0.80 (1.84%)
PIBTL 9.01 Decreased By ▼ -0.06 (-0.66%)
PPL 194.00 Decreased By ▼ -4.24 (-2.14%)
PRL 43.50 Increased By ▲ 1.26 (2.98%)
PTC 26.62 Decreased By ▼ -0.77 (-2.81%)
SEARL 107.00 Decreased By ▼ -3.08 (-2.8%)
TELE 10.14 Decreased By ▼ -0.38 (-3.61%)
TOMCL 35.95 Decreased By ▼ -0.67 (-1.83%)
TPLP 14.58 Decreased By ▼ -0.37 (-2.47%)
TREET 25.98 Decreased By ▼ -0.55 (-2.07%)
TRG 67.40 Decreased By ▼ -1.45 (-2.11%)
UNITY 33.59 Decreased By ▼ -0.60 (-1.75%)
WTL 1.73 Decreased By ▼ -0.06 (-3.35%)
BR100 12,397 Increased By 33.3 (0.27%)
BR30 37,347 Decreased By -871.2 (-2.28%)
KSE100 117,587 Increased By 467.3 (0.4%)
KSE30 37,065 Increased By 128 (0.35%)

The government has reportedly shifted load shedding burden to rural areas to show Islamabad residents that there is no unscheduled load shedding in the country. Informed sources told Business Recorder that the shortfall on Monday was around 5000 MW as generation was 14,700 MW during the day and increased to 14,900 MW at peak hours. Of this, 6000 MW was hydel generation whereas remaining generation was from Independent Power Producers (IPPs) and public sector generation companies (Gencos).
The sources further stated that the much talked about controversial Nandipur Power Project is not generating any electricity for the last two weeks whereas Guddu thermal power plant is producing 340 MW against capacity of 747 MW. Guddu complex is also dysfunctional due to non availability of gas with a potential capacity of 1200 MW. AES Pak-Gen 300 MW is also out of the system for the last two months because of 'bushing problems'.
An official told Business Recorder that on Sunday average demand was 17900 MW, however, he did not give generation figures of Sunday. According to the official, peak generation on Monday would be around 15800 MW. Hydel will touch 6700 MW, Gencos 2000MW and IPPs 7024 MW. He said 650 MW will remain on standby as per the merit order.

Copyright Business Recorder, 2015

Comments

Comments are closed.