AGL 40.01 Decreased By ▼ -0.02 (-0.05%)
AIRLINK 128.34 Increased By ▲ 0.64 (0.5%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.53 Decreased By ▼ -0.07 (-1.52%)
DCL 9.24 Increased By ▲ 0.45 (5.12%)
DFML 41.58 No Change ▼ 0.00 (0%)
DGKC 87.06 Increased By ▲ 1.27 (1.48%)
FCCL 32.60 Increased By ▲ 0.11 (0.34%)
FFBL 64.50 Increased By ▲ 0.47 (0.73%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 111.75 Increased By ▲ 0.98 (0.88%)
HUMNL 14.84 Decreased By ▼ -0.23 (-1.53%)
KEL 5.05 Increased By ▲ 0.17 (3.48%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.86 Increased By ▲ 0.34 (0.84%)
NBP 61.40 Increased By ▲ 0.35 (0.57%)
OGDC 195.55 Increased By ▲ 0.68 (0.35%)
PAEL 27.55 Increased By ▲ 0.04 (0.15%)
PIBTL 7.69 Decreased By ▼ -0.12 (-1.54%)
PPL 153.30 Increased By ▲ 0.77 (0.5%)
PRL 26.75 Increased By ▲ 0.17 (0.64%)
PTC 16.20 Decreased By ▼ -0.06 (-0.37%)
SEARL 83.51 Decreased By ▼ -0.63 (-0.75%)
TELE 7.86 Decreased By ▼ -0.10 (-1.26%)
TOMCL 36.48 Decreased By ▼ -0.12 (-0.33%)
TPLP 8.95 Increased By ▲ 0.29 (3.35%)
TREET 17.00 Decreased By ▼ -0.66 (-3.74%)
TRG 59.15 Increased By ▲ 0.53 (0.9%)
UNITY 27.51 Increased By ▲ 0.65 (2.42%)
WTL 1.33 Decreased By ▼ -0.05 (-3.62%)
BR100 10,000 No Change 0 (0%)
BR30 31,002 No Change 0 (0%)
KSE100 94,960 Increased By 768 (0.82%)
KSE30 29,500 Increased By 298.4 (1.02%)

More than 39,000 smart meters have been installed successfully under USAID-funded AMI Project which has been implemented in Mepco and Pesco to cater to the small industrial, agricultural (tube wells), and public sector consumers. This project has launched to reduce distribution losses and modernise the electricity metering and billing operations. In Mepco, more than 39,000 smart meters have been installed so far.
These meters were installed in series with existing billing meters and automatically transfers the metering data via GSM/ GPRS communication medium to the server after specified time interval. Under a phase wise programme, the billing operations will be transferred to these AMR meters. One sub division has been effectively integrated with the billing system in order to eradicate any problem that might arise in the operations of the system. After successfully converting the billing of one sub division, the project is in the second phase to integrate other sub divisions with the billing system. A Pakistani company has implemented the complete solution comprising smart meters, IT infrastructure and software. Also, AMI Cell has been established at Mepco office with trained staff for smooth transferring and integration of the billing operations.

Copyright Business Recorder, 2015

Comments

Comments are closed.